If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485141306004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14485,"lon":-115.921508,"icon":""}]} |
Location: 00/06-13-048-14W5/4 | |
Location Alias: 00/06-13-48-14 W5M | |
Location Alias 2: 00/06-13-048-14 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 14 | |
Section: 13 | |
County/Municipality: Yellowhead County | |
Well Name: CVE BRAZR 12-13-48-14 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0199784 | |
License Date: 1997-03-25 | |
License Status: Amended | |
Spud Date: 1997-03-29 | |
Final Drill Date: 1997-10-15 | |
Well Total Depth: 3359.00 m | |
Surface Hole Latitude: 53.144850 | |
Surface Hole Longitude: -115.921508 |
Date | Event |
---|---|
1997-03-25 | Obtained License |
1997-10-01 | Direction Drilling Operation Performed - Horizontal |
1997-10-15 | Finished Drilling |
1997-10-15 | Well Mode changed to Drilled and Cased |
1997-10-17 | Well Log Performed |
1997-10-19 | Liner Casing Operation Performed |
1997-10-19 | Perforation Treatment Performed - Open-Hole Completion |
1997-10-19 | Perforation Treatment Performed - Slotted Liner or Casing |
1997-10-20 | Rig Released |
1997-10-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-11-26 | Well Log Performed |
2002-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-08-02 | Plug Back Performed |
2002-08-05 | Perforation Treatment Performed - Jet Perforation |
2002-08-29 | Perforation Treatment Performed - Fractured |
2009-11-30 | Well Fluid changed to Gas |
2009-11-30 | Well Mode changed to Testing |
2009-12-03 | Perforation Treatment Performed - Jet Perforation |
2009-12-06 | Perforation Treatment Performed - Fractured |
2009-12-10 | Well Fluid changed to Gas |
2009-12-10 | Well Mode changed to Test Completed |
2009-12-11 | Perforation Treatment Performed - Cement Squeeze |
2009-12-11 | Plug Back Performed |
2009-12-11 | Well Fluid changed to Gas |
2009-12-11 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-10-01 | 2819.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-19 | Slotted Liner | 2814.00 | 2919.40 | 0 |
1997-10-19 | Open Hole/Barefoot Completion | 2919.40 | 3359.00 | 0 |
1997-10-31 | Acid Treatment | 2819.10 | 3359.00 | 0 |
2002-08-02 | Packing Device Capped w/Cement | 2807.00 | 2810.00 | 0 |
2002-08-05 | Perforation | 2779.00 | 2785.00 | 20 |
2002-08-29 | Fracture | 2779.00 | 2785.00 | 0 |
2009-12-03 | Perforation | 1620.00 | 1624.00 | 20 |
2009-12-06 | Fracture | 1620.00 | 1624.00 | 0 |
2009-12-11 | Cement Squeeze | 1620.00 | 1624.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 19 | 0.0 | 0.0 | 0.0 |
For data sources see[6]