X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675092104000

Well Details

Well ID: 0675092104000
Loading map...
Location: 00/04-21-067-09W5/0
Location Alias: 00/04-21-67-09 W5M
Location Alias 2: 00/04-21-067-09 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 09
Section: 21
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 4-21-67-9
Operator Name: Razor Energy Corp.
License Number: 0025624
License Date: 1964-01-31
License Status: Suspension
Spud Date: 1964-02-06
Final Drill Date: 1964-02-24
Well Total Depth: 2446.00 m
Surface Hole Latitude: 54.808291
Surface Hole Longitude: -115.320522

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-01-31 Obtained License
1964-02-24 Finished Drilling
1964-02-24 Well Mode changed to Drilled and Cased
1964-02-25 Production Casing Operation Performed
1964-03-07 Perforation Treatment Performed - Selective Bullet Perforations
1964-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-11 Well Began Production
1964-03-11 Well Fluid changed to Crude Oil
1964-03-11 Well Mode changed to Flowing
1967-06-25 Well Began Injection
1967-06-25 Well Fluid changed to Water
1967-06-25 Well Type changed to Injection
1967-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-21 Well Fluid changed to Water
1977-10-21 Well Mode changed to Suspended
1977-10-21 Well Type changed to Injection
1991-01-05 Perforation Treatment Performed - Cement Squeeze
1991-01-07 Perforation Treatment Performed - Cement Plug
1991-01-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-03-07 Selective Bullet Perforations 2394.20 2397.30 0
1991-01-07 Cement Plug 2131.70 2196.50 0
1964-03-07 Selective Bullet Perforations 2399.70 2400.90 0
1964-03-07 Selective Bullet Perforations 2401.50 2404.60 0
1964-03-07 Selective Bullet Perforations 2405.20 2406.10 0
1964-03-07 Selective Bullet Perforations 2417.10 2425.00 0
1964-03-07 Selective Bullet Perforations 2428.30 2428.30 0
1964-03-08 Acid Treatment 2394.20 2428.30 0
1967-12-09 Acid Treatment 2394.20 2428.30 0
1991-01-05 Cement Squeeze 2394.20 2428.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3454 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0

For data sources see[5]

References