X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675111210000

Well Details

Well ID: 0675111210000
Loading map...
Location: 00/10-12-067-11W5/0
Location Alias: 00/10-12-67-11 W5M
Location Alias 2: 00/10-12-067-11 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 11
Section: 12
County/Municipality: Big Lakes County
Well Name: 1976082 SWANH 10-12-67-11
Operator Name: Razor Energy Corp.
License Number: 0029570
License Date: 1965-12-08
License Status: Suspension
Spud Date: 1965-12-09
Final Drill Date: 1965-12-31
Well Total Depth: 2650.80 m
Surface Hole Latitude: 54.786549
Surface Hole Longitude: -115.535784

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-08 Obtained License
1965-12-31 Finished Drilling
1965-12-31 Well Mode changed to Drilled and Cased
1966-01-04 Production Casing Operation Performed
1966-01-21 Perforation Treatment Performed - Bullet Perforation
1966-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-01-31 Perforation Treatment Performed - Cement Squeeze
1966-02-01 Perforation Treatment Performed - Bullet Perforation
1966-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-13 Well Began Production
1966-02-13 Well Fluid changed to Crude Oil
1966-02-13 Well Mode changed to Flowing
1983-07-07 Perforation Treatment Performed - Jet Perforation
1983-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-27 Well Fluid changed to Crude Oil
2000-10-27 Well Mode changed to Pumping
2010-09-16 Well Fluid changed to Crude Oil
2010-09-16 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-01-21 Bullet Perforation 2614.60 2617.00 7
1966-01-24 Acid Treatment 2614.60 2617.00 0
1966-01-31 Cement Squeeze 2614.60 2617.00 0
1966-02-01 Bullet Perforation 2607.90 2610.30 7
1966-02-02 Acid Treatment 2607.90 2610.30 0
1983-07-07 Perforation 2595.70 2604.50 13
1983-07-09 Acid Treatment 2595.70 2604.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 937 0.0 0.0 0.0
1971 2510 0.0 0.0 0.0
1972 4641 0.0 0.0 0.0
1973 8148 0.0 0.0 0.0
1974 4043 0.0 0.0 0.0
1975 2595 0.0 0.0 0.0
1976 5073 0.0 0.0 0.0
1977 1584 0.0 0.0 0.0
1978 1026 0.0 0.0 0.0
1979 5837 0.0 0.0 0.0
1980 5731 0.0 0.0 0.0
1981 6241 0.0 0.0 0.0
1982 7020 0.0 0.0 0.0
1983 5103 0.0 0.0 0.0
1984 3543 0.0 0.0 0.0
1985 7740 0.0 0.0 0.0
1986 8130 0.0 0.0 0.0
1987 8671 0.0 0.0 0.0
1988 8716 0.0 0.0 0.0
1989 8455 0.0 0.0 0.0
1990 8706 0.0 0.0 0.0
1991 8670 0.0 0.0 0.0
1992 8698 0.0 0.0 0.0
1993 8321 0.0 0.0 0.0
1994 8694 0.0 0.0 0.0
1995 8599 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8367 0.0 0.0 0.0
1998 7308 0.0 0.0 0.0
1999 3888 0.0 0.0 0.0
2000 8710 0.0 0.0 0.0
2001 6845 0.0 0.0 0.0
2002 7798 0.0 0.0 0.0
2003 5945 0.0 0.0 0.0
2004 7727 0.0 0.0 0.0
2005 5104 0.0 0.0 0.0
2006 6110 0.0 0.0 0.0
2007 7652 0.0 0.0 0.0
2008 6524 0.0 0.0 0.0
2009 4321 0.0 0.0 0.0

For data sources see[5]

References