If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 1156070505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.954696,"lon":-119.160933,"icon":""}]} |
| Location: 00/05-05-115-07W6/0 | |
| Location Alias: 00/05-05-15-07 W6M | |
| Location Alias 2: 00/05-05-115-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 115 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 05 | |
| County/Municipality: Mackenzie County | |
| Well Name: ACL AMBER 5-5-115-7 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0104381 | |
| License Date: 1983-11-28 | |
| License Status: Abandoned | |
| Spud Date: 1983-11-29 | |
| Final Drill Date: 1983-12-31 | |
| Well Total Depth: 1620.00 m | |
| Surface Hole Latitude: 58.954696 | |
| Surface Hole Longitude: -119.160933 |
| Date | Event |
|---|---|
| 1983-11-28 | Obtained License |
| 1983-12-13 | Drill Stem Test Performed |
| 1983-12-17 | Drill Stem Test Performed |
| 1983-12-18 | Drill Stem Test Performed |
| 1983-12-21 | Drill Stem Test Performed |
| 1983-12-22 | Drill Stem Test Performed |
| 1983-12-25 | Drill Stem Test Performed |
| 1983-12-26 | Drill Stem Test Performed |
| 1983-12-27 | Drill Stem Test Performed |
| 1983-12-28 | Drill Stem Test Performed |
| 1983-12-30 | Drill Stem Test Performed |
| 1983-12-31 | Finished Drilling |
| 1983-12-31 | Well Log Performed |
| 1983-12-31 | Well Mode changed to Drilled and Cased |
| 1984-01-03 | Production Casing Operation Performed |
| 1984-01-11 | Well Log Performed |
| 1984-01-13 | Perforation Treatment Performed - Jet Perforation |
| 1984-01-13 | Well Log Performed |
| 1984-01-15 | Well Began Production |
| 1984-01-15 | Well Fluid changed to Crude Oil |
| 1984-01-15 | Well Mode changed to Flowing |
| 1985-08-01 | Well Log Performed |
| 1986-09-12 | Perforation Treatment Performed - Open-Hole Completion |
| 1986-09-13 | Perforation Treatment Performed - Jet Perforation |
| 1986-09-13 | Well Log Performed |
| 1986-09-14 | Well Fluid changed to Crude Oil |
| 1986-09-14 | Well Mode changed to Pumping |
| 1987-09-29 | Well Log Performed |
| 1987-10-08 | Well Log Performed |
| 1987-10-09 | Perforation Treatment Performed - Jet Perforation |
| 1987-10-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1997-01-22 | Well Log Performed |
| 1997-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-09-24 | Perforation Treatment Performed - Cement Squeeze |
| 2006-09-24 | Plug Back Performed |
| 2006-09-24 | Well Fluid changed to Crude Oil |
| 2006-09-24 | Well Mode changed to Abandoned Zone |
| 2006-09-25 | Well Log Performed |
| 2006-09-26 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-27 | Perforation Treatment Performed - Remedial Casing |
| 2006-10-13 | Well Abandoned |
| 2006-10-13 | Well Fluid changed to Crude Oil |
| 2006-10-13 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-01-13 | Perforation | 1582.00 | 1585.00 | 13 |
| 1997-01-23 | Perforation | 1545.00 | 1546.00 | 13 |
| 1997-01-23 | Perforation | 1534.00 | 1536.00 | 13 |
| 1997-01-23 | Perforation | 1516.80 | 1518.50 | 13 |
| 1997-01-23 | Perforation | 1511.50 | 1512.50 | 13 |
| 1997-01-23 | Perforation | 1506.00 | 1507.00 | 13 |
| 2006-09-24 | Packing Device Capped w/Cement | 1568.00 | 1576.00 | 0 |
| 2006-09-24 | Cement Squeeze | 1506.00 | 1568.00 | 0 |
| 2006-09-24 | Packing Device Capped w/Cement | 1490.00 | 1500.70 | 0 |
| 2006-09-26 | Perforation | 409.00 | 410.00 | 14 |
| 2006-09-27 | Remedial Casing Cementing | 409.00 | 410.00 | 0 |
| 1986-09-12 | Open Hole/Barefoot Completion | 1593.50 | 1598.90 | 0 |
| 1986-09-13 | Perforation | 1585.60 | 1595.10 | 13 |
| 1987-10-09 | Perforation | 1578.00 | 1579.30 | 13 |
| 1987-10-11 | Acid Treatment | 1578.00 | 1579.30 | 0 |
| 1997-01-23 | Perforation | 1571.50 | 1573.00 | 13 |
| 1997-01-23 | Perforation | 1567.80 | 1568.80 | 13 |
| 1997-01-23 | Perforation | 1563.00 | 1565.00 | 13 |
| 1997-01-23 | Perforation | 1555.00 | 1556.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 4959 | 0.0 | 0.0 | 0.0 |
| 1985 | 7133 | 0.0 | 0.0 | 0.0 |
| 1986 | 6809 | 0.0 | 0.0 | 0.0 |
| 1987 | 7757 | 0.0 | 0.0 | 0.0 |
| 1988 | 8296 | 0.0 | 0.0 | 0.0 |
| 1989 | 2586 | 0.0 | 0.0 | 0.0 |
| 1991 | 1148 | 0.0 | 0.0 | 0.0 |
| 1992 | 6360 | 0.0 | 0.0 | 0.0 |
| 1993 | 7470 | 0.0 | 0.0 | 0.0 |
| 1994 | 5853 | 0.0 | 0.0 | 0.0 |
| 1995 | 8443 | 0.0 | 0.0 | 0.0 |
| 1996 | 1660 | 0.0 | 0.0 | 0.0 |
| 1997 | 3217 | 0.0 | 0.0 | 0.0 |
| 1998 | 504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]