X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1176041510000

Well Details

Well ID: 1176041510000
Loading map...
Location: 00/10-15-117-04W6/0
Location Alias: 00/10-15-17-04 W6M
Location Alias 2: 00/10-15-117-04 W6/00
Country: Canada
Province: Alberta
Township: 117
Meridian: 6
Range: 04
Section: 15
County/Municipality: Mackenzie County
Well Name: ACL ZAMA 10-15-117-4
Operator Name: Paramount Resources Ltd.
License Number: 0031831
License Date: 1967-02-23
License Status: Abandoned
Spud Date: 1967-03-05
Final Drill Date: 1967-03-27
Well Total Depth: 1557.50 m
Surface Hole Latitude: 59.163176
Surface Hole Longitude: -118.580401

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-02-23 Obtained License
1967-03-19 Drill Stem Test Performed
1967-03-24 Drill Stem Test Performed
1967-03-27 Finished Drilling
1967-03-27 Well Mode changed to Drilled and Cased
1967-03-28 Intermediate Casing Operation Performed
1967-04-05 Perforation Treatment Performed - Jet Perforation
1967-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-04-09 Well Began Production
1967-04-09 Well Fluid changed to Crude Oil
1967-04-09 Well Mode changed to Flowing
1968-01-13 Perforation Treatment Performed - Cement Squeeze
1968-01-18 Perforation Treatment Performed - Jet Perforation
1968-01-19 Perforation Treatment Performed - Acid Wash - No Pressure
1968-08-10 Perforation Treatment Performed - Jet Perforation
1968-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-08-14 Perforation Treatment Performed - Cement Squeeze
1968-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-13 Well Fluid changed to Crude Oil
1986-05-13 Well Mode changed to Pumping
1990-02-08 Well Log Performed
1990-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-13 Plug Back Performed
1990-02-13 Well Fluid changed to Crude Oil
1990-02-13 Well Mode changed to Abandoned Zone
1990-02-18 Perforation Treatment Performed - Jet Perforation
1990-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-12 Plug Back Performed
1994-02-15 Production Casing Operation Performed
1994-02-21 Perforation Treatment Performed - Jet Perforation
1996-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-08 Perforation Treatment Performed - Jet Perforation
2010-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-14 Perforation Treatment Performed - Cement Squeeze
2010-02-14 Plug Back Performed
2010-02-14 Well Log Performed
2010-02-15 Perforation Treatment Performed - Jet Perforation
2010-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-16 Perforation Treatment Performed - Remedial Casing
2010-02-16 Well Log Performed
2010-02-17 Perforation Treatment Performed - Jet Perforation
2010-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-18 Perforation Treatment Performed - Remedial Casing
2010-03-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-04-05 Perforation 1307.90 1310.60 7
1968-01-13 Cement Squeeze 1421.60 1429.20 0
1968-01-18 Perforation 1421.60 1422.80 10
1968-01-18 Perforation 1424.00 1427.10 10
1968-01-19 Acid Wash 1421.60 1427.10 0
1968-08-10 Perforation 1440.20 1441.40 10
1968-08-12 Acid Treatment 1440.20 1441.40 0
1968-08-14 Cement Squeeze 1440.20 1441.40 0
1968-08-23 Acid Treatment 1307.90 1320.40 0
1990-02-13 Packing Device Capped w/Cement 1405.00 1413.00 0
1990-02-18 Perforation 1305.00 1312.00 14
1967-04-05 Perforation 1314.90 1315.50 7
1990-02-18 Perforation 1316.50 1318.00 14
1990-02-18 Perforation 1319.50 1323.00 14
1990-02-20 Acid Treatment 1305.00 1323.00 0
1994-02-12 Packing Device Capped w/Cement 1289.00 1297.00 0
1994-02-21 Perforation 1255.30 1256.40 13
1994-02-21 Perforation 1258.80 1260.70 13
1994-02-21 Perforation 1265.50 1266.10 13
1996-09-11 Acid Treatment 1255.30 1260.70 0
2010-02-08 Perforation 1240.00 1241.00 13
2010-02-14 Cement Squeeze 1255.30 1266.10 0
1967-04-05 Perforation 1316.40 1318.00 7
2010-02-14 Packing Device Capped w/Cement 988.50 1232.00 0
2010-02-15 Perforation 598.00 599.00 13
2010-02-16 Packing Device Capped w/Cement 512.00 594.00 0
2010-02-16 Remedial Casing Cementing 598.00 599.00 0
2010-02-17 Perforation 255.00 256.00 13
2010-02-18 Remedial Casing Cementing 255.00 256.00 0
2010-02-18 Packing Device Capped w/Cement 249.00 251.00 0
1967-04-05 Perforation 1319.20 1320.40 7
1967-04-05 Perforation 1421.60 1422.80 7
1967-04-05 Perforation 1424.00 1427.10 7
1967-04-05 Perforation 1428.30 1429.20 7
1967-04-07 Acid Treatment 1307.90 1320.40 0
1967-04-08 Acid Treatment 1421.60 1429.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 359 0.0 0.0 0.0
1968 4774 0.0 0.0 0.0
1969 4315 0.0 0.0 0.0
1970 1632 0.0 0.0 0.0
1971 2113 0.0 0.0 0.0
1972 3171 0.0 0.0 0.0
1973 7211 0.0 0.0 0.0
1974 7798 0.0 0.0 0.0
1975 4611 0.0 0.0 0.0
1976 5560 0.0 0.0 0.0
1977 6858 0.0 0.0 0.0
1978 3648 0.0 0.0 0.0
1979 6068 0.0 0.0 0.0
1980 3912 0.0 0.0 0.0
1981 4990 0.0 0.0 0.0
1982 6798 0.0 0.0 0.0
1983 7212 0.0 0.0 0.0
1984 7329 0.0 0.0 0.0
1985 8405 0.0 0.0 0.0
1986 8442 0.0 0.0 0.0
1987 8605 0.0 0.0 0.0
1988 8579 0.0 0.0 0.0
1989 8367 0.0 0.0 0.0
1990 795 0.0 0.0 0.0

For data sources see[5]

References