If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504262901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.339659,"lon":-113.760071,"icon":""}]} |
Location: 00/01-29-050-26W4/0 | |
Location Alias: 00/01-29-50-26 W4M | |
Location Alias 2: 00/01-29-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 29 | |
County/Municipality: Leduc County | |
Well Name: MEC LEDUC-WB 1-29-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: B0002493 | |
License Date: 1948-11-24 | |
License Status: Abandoned | |
Spud Date: 1948-11-23 | |
Final Drill Date: 1949-01-11 | |
Well Total Depth: 1625.20 m | |
Surface Hole Latitude: 53.339659 | |
Surface Hole Longitude: -113.760071 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-11-24 | Obtained License |
1948-11-27 | Drill Stem Test Performed |
1948-11-29 | Drill Stem Test Performed |
1948-11-30 | Drill Stem Test Performed |
1948-12-02 | Drill Stem Test Performed |
1948-12-03 | Drill Stem Test Performed |
1948-12-04 | Drill Stem Test Performed |
1948-12-31 | Drill Stem Test Performed |
1949-01-11 | Finished Drilling |
1949-01-11 | Well Mode changed to Drilled and Cased |
1949-01-12 | Liner Casing Operation Performed |
1949-01-14 | Perforation Treatment Performed - Cement Squeeze |
1949-01-14 | Perforation Treatment Performed - Jet Perforation |
1949-01-18 | Perforation Treatment Performed - Cement Squeeze |
1949-01-18 | Perforation Treatment Performed - Jet Perforation |
1949-01-22 | Perforation Treatment Performed - Cement Squeeze |
1949-01-22 | Perforation Treatment Performed - Jet Perforation |
1949-01-25 | Perforation Treatment Performed - Cement Squeeze |
1949-01-25 | Perforation Treatment Performed - Jet Perforation |
1949-02-05 | Perforation Treatment Performed - Bullet Perforation |
1949-02-08 | Well Began Production |
1949-02-08 | Well Fluid changed to Crude Oil |
1949-02-08 | Well Mode changed to Flowing |
1977-10-11 | Well Fluid changed to Crude Oil |
1977-10-11 | Well Mode changed to Pumping |
1988-01-07 | Well Log Performed |
1988-01-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-11 | Perforation Treatment Performed - Jet Perforation |
1988-01-11 | Well Log Performed |
1988-01-13 | Perforation Treatment Performed - Jet Perforation |
1988-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-10-24 | Well Fluid changed to Crude Oil |
1989-10-24 | Well Mode changed to Suspended |
2001-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-03-26 | Plug Back Performed |
2001-03-26 | Well Fluid changed to Crude Oil |
2001-03-26 | Well Mode changed to Abandoned Zone |
2001-03-28 | Perforation Treatment Performed - Jet Perforation |
2001-03-29 | Perforation Treatment Performed - Fractured |
2001-03-31 | Perforation Treatment Performed - Jet Perforation |
2019-02-12 | Perforation Treatment Performed - Cement Plug |
2019-02-12 | Perforation Treatment Performed - Cement Squeeze |
2019-02-12 | Plug Back Performed |
2019-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-13 | Perforation Treatment Performed - Jet Perforation |
2019-02-13 | Plug Back Performed |
2019-02-13 | Well Log Performed |
2019-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-02-14 | Perforation Treatment Performed - Cement Squeeze |
2019-02-14 | Plug Back Performed |
2019-02-15 | Well Log Performed |
2019-03-05 | Perforation Treatment Performed - Jet Perforation |
2019-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-06 | Perforation Treatment Performed - Cement Squeeze |
2019-03-06 | Plug Back Performed |
2019-03-14 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-01-14 | Perforation | 1527.60 | 1529.60 | 3 |
1988-01-08 | Packing Device Capped w/Cement | 1621.50 | 1623.10 | 0 |
1988-01-11 | Perforation | 1618.20 | 1618.40 | 3 |
1988-01-11 | Acid Treatment | 1618.20 | 1618.40 | 0 |
1988-01-13 | Perforation | 1618.00 | 1618.20 | 4 |
1988-01-14 | Acid Treatment | 1618.00 | 1618.20 | 0 |
2001-03-26 | Packing Device Capped w/Cement | 1594.00 | 1602.00 | 0 |
2001-03-28 | Perforation | 1351.50 | 1352.70 | 14 |
2001-03-29 | Fracture | 1351.50 | 1352.70 | 0 |
2001-03-31 | Perforation | 1265.80 | 1268.00 | 14 |
2019-02-12 | Cement Squeeze | 1351.50 | 1352.70 | 0 |
1949-01-14 | Cement Squeeze | 1527.60 | 1529.60 | 0 |
2019-02-12 | Cement Squeeze | 1265.80 | 1268.00 | 0 |
2019-02-12 | Cement Plug | 969.80 | 1560.00 | 0 |
2019-02-13 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
2019-02-13 | Perforation | 353.00 | 354.00 | 13 |
2019-02-14 | Cement Squeeze | 353.00 | 354.00 | 0 |
2019-02-14 | Packing Device Capped w/Cement | 340.00 | 348.00 | 0 |
2019-03-05 | Perforation | 268.00 | 269.00 | 13 |
2019-03-06 | Cement Squeeze | 268.00 | 269.00 | 0 |
2019-03-06 | Packing Device Capped w/Cement | 256.00 | 264.00 | 0 |
1949-01-18 | Perforation | 1360.50 | 1362.50 | 3 |
1949-01-18 | Cement Squeeze | 1360.50 | 1362.50 | 0 |
1949-01-22 | Perforation | 1288.20 | 1290.20 | 3 |
1949-01-22 | Cement Squeeze | 1288.20 | 1290.20 | 0 |
1949-01-25 | Perforation | 1079.00 | 1081.00 | 3 |
1949-01-25 | Cement Squeeze | 1079.00 | 1081.00 | 0 |
1949-02-05 | Bullet Perforation | 1621.50 | 1623.10 | 23 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5390 | 0.0 | 0.0 | 0.0 |
1968 | 7861 | 0.0 | 0.0 | 0.0 |
1969 | 3400 | 0.0 | 0.0 | 0.0 |
1972 | 5448 | 0.0 | 0.0 | 0.0 |
1973 | 8313 | 0.0 | 0.0 | 0.0 |
1974 | 8442 | 0.0 | 0.0 | 0.0 |
1975 | 8565 | 0.0 | 0.0 | 0.0 |
1976 | 8421 | 0.0 | 0.0 | 0.0 |
1977 | 8113 | 0.0 | 0.0 | 0.0 |
1978 | 8552 | 0.0 | 0.0 | 0.0 |
1979 | 8572 | 0.0 | 0.0 | 0.0 |
1980 | 8483 | 0.0 | 0.0 | 0.0 |
1981 | 8108 | 0.0 | 0.0 | 0.0 |
1982 | 6611 | 0.0 | 0.0 | 0.0 |
1983 | 8395 | 0.0 | 0.0 | 0.0 |
1984 | 8033 | 0.0 | 0.0 | 0.0 |
1985 | 7264 | 0.0 | 0.0 | 0.0 |
1986 | 8349 | 0.0 | 0.0 | 0.0 |
1987 | 1032 | 0.0 | 0.0 | 0.0 |
1988 | 8059 | 0.0 | 0.0 | 0.0 |
1989 | 4645 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]