If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263005000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.343633,"lon":-113.802346,"icon":""}]} |
Location: 00/05-30-050-26W4/0 | |
Location Alias: 00/05-30-50-26 W4M | |
Location Alias 2: 00/05-30-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 30 | |
County/Municipality: Leduc County | |
Well Name: IMPERIAL LEDUC NO 566 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0006477 | |
License Date: 1953-05-22 | |
License Status: RecCertified | |
Spud Date: 1953-06-14 | |
Final Drill Date: 1953-07-11 | |
Well Total Depth: 1620.00 m | |
Surface Hole Latitude: 53.343633 | |
Surface Hole Longitude: -113.802346 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-05-22 | Obtained License |
1953-06-26 | Drill Stem Test Performed |
1953-07-02 | Drill Stem Test Performed |
1953-07-03 | Drill Stem Test Performed |
1953-07-04 | Drill Stem Test Performed |
1953-07-09 | Liner Casing Operation Performed |
1953-07-11 | Finished Drilling |
1953-07-11 | Well Mode changed to Drilled and Cased |
1953-07-14 | Perforation Treatment Performed - Jet Perforation |
1953-07-18 | Well Began Production |
1953-07-18 | Well Fluid changed to Crude Oil |
1953-07-18 | Well Mode changed to Flowing |
1972-06-06 | Well Fluid changed to Crude Oil |
1972-06-06 | Well Mode changed to Pumping |
1982-06-24 | Perforation Treatment Performed - Cement Squeeze |
1982-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-30 | Perforation Treatment Performed - Jet Perforation |
1985-02-14 | Perforation Treatment Performed - Cement Squeeze |
1985-02-19 | Perforation Treatment Performed - Jet Perforation |
1985-02-19 | Well Log Performed |
1985-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-08 | Perforation Treatment Performed - Cement Squeeze |
1988-09-08 | Well Log Performed |
1988-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-12 | Perforation Treatment Performed - Jet Perforation |
1988-09-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-13 | Perforation Treatment Performed - Jet Perforation |
1988-09-13 | Well Log Performed |
1994-05-01 | Well Fluid changed to Crude Oil |
1994-05-01 | Well Mode changed to Suspended |
1995-05-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-03 | Plug Back Performed |
1995-05-03 | Well Fluid changed to Crude Oil |
1995-05-03 | Well Log Performed |
1995-05-03 | Well Mode changed to Abandoned |
1995-05-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-07-14 | Perforation | 1616.40 | 1617.90 | 13 |
1988-09-12 | Acid Treatment | 1612.90 | 1613.00 | 0 |
1988-09-13 | Perforation | 1612.00 | 1612.10 | 13 |
1988-09-13 | Acid Treatment | 1612.00 | 1613.00 | 0 |
1995-05-03 | Packing Device Capped w/Cement | 1562.00 | 1570.00 | 0 |
1995-05-03 | Packing Device Capped w/Cement | 1192.00 | 1200.00 | 0 |
1982-06-24 | Cement Squeeze | 1616.40 | 1617.90 | 0 |
1982-06-30 | Perforation | 1616.20 | 1616.40 | 10 |
1982-06-30 | Acid Treatment | 1616.20 | 1616.40 | 0 |
1985-02-14 | Cement Squeeze | 1616.20 | 1616.30 | 0 |
1985-02-19 | Perforation | 1615.40 | 1615.50 | 10 |
1985-02-20 | Acid Treatment | 1615.40 | 1615.50 | 0 |
1988-09-08 | Cement Squeeze | 1615.40 | 1615.50 | 0 |
1988-09-12 | Perforation | 1612.90 | 1613.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 4776 | 0.0 | 0.0 | 0.0 |
1973 | 8422 | 0.0 | 0.0 | 0.0 |
1974 | 8471 | 0.0 | 0.0 | 0.0 |
1975 | 8351 | 0.0 | 0.0 | 0.0 |
1976 | 8247 | 0.0 | 0.0 | 0.0 |
1977 | 8276 | 0.0 | 0.0 | 0.0 |
1978 | 8583 | 0.0 | 0.0 | 0.0 |
1979 | 8499 | 0.0 | 0.0 | 0.0 |
1980 | 8459 | 0.0 | 0.0 | 0.0 |
1981 | 8367 | 0.0 | 0.0 | 0.0 |
1982 | 6974 | 0.0 | 0.0 | 0.0 |
1983 | 8515 | 0.0 | 0.0 | 0.0 |
1984 | 8221 | 0.0 | 0.0 | 0.0 |
1985 | 7765 | 0.0 | 0.0 | 0.0 |
1986 | 8346 | 0.0 | 0.0 | 0.0 |
1987 | 7865 | 0.0 | 0.0 | 0.0 |
1988 | 7788 | 0.0 | 0.0 | 0.0 |
1989 | 8157 | 0.0 | 0.0 | 0.0 |
1990 | 8657 | 0.0 | 0.0 | 0.0 |
1991 | 8450 | 0.0 | 0.0 | 0.0 |
1992 | 8047 | 0.0 | 0.0 | 0.0 |
1993 | 7088 | 0.0 | 0.0 | 0.0 |
1994 | 2028 | 0.0 | 0.0 | 0.0 |
For data sources see[5]