If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524262311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.506677,"lon":-113.728748,"icon":""}]} |
Location: 00/11-23-052-26W4/0 | |
Location Alias: 00/11-23-52-26 W4M | |
Location Alias 2: 00/11-23-052-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 052 | |
Meridian: 4 | |
Range: 26 | |
Section: 23 | |
County/Municipality: Stony Plain 135 | |
Well Name: CEDAR CREEK ACH 11-23-52-26 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0003188 | |
License Date: 1951-07-14 | |
License Status: Suspension | |
Spud Date: 1951-07-30 | |
Final Drill Date: 1951-09-06 | |
Well Total Depth: 1561.80 m | |
Surface Hole Latitude: 53.506677 | |
Surface Hole Longitude: -113.728748 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-07-14 | Obtained License |
1951-08-07 | Drill Stem Test Performed |
1951-08-09 | Drill Stem Test Performed |
1951-08-13 | Drill Stem Test Performed |
1951-08-15 | Drill Stem Test Performed |
1951-08-16 | Drill Stem Test Performed |
1951-08-20 | Drill Stem Test Performed |
1951-08-24 | Drill Stem Test Performed |
1951-08-28 | Production Casing Operation Performed |
1951-09-02 | Drill Stem Test Performed |
1951-09-04 | Drill Stem Test Performed |
1951-09-05 | Drill Stem Test Performed |
1951-09-06 | Drill Stem Test Performed |
1951-09-06 | Finished Drilling |
1951-09-06 | Perforation Treatment Performed - Open-Hole Completion |
1951-09-06 | Well Mode changed to Drilled and Cased |
1951-09-09 | Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug |
1951-09-11 | Well Began Production |
1951-09-11 | Well Fluid changed to Crude Oil |
1951-09-11 | Well Mode changed to Flowing |
1965-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-10-07 | Perforation Treatment Performed - Open-Hole Completion |
1978-09-13 | Well Fluid changed to Crude Oil |
1978-09-13 | Well Mode changed to Pumping |
1980-07-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-07-12 | Perforation Treatment Performed - Jet Perforation |
1980-07-12 | Well Fluid changed to Crude Oil |
1980-07-12 | Well Mode changed to Abandoned Zone |
1988-08-30 | Well Log Performed |
1988-08-31 | Perforation Treatment Performed - Jet Perforation |
1988-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-21 | Perforation Treatment Performed - Jet Perforation |
1990-11-09 | Well Log Performed |
1994-07-16 | Well Log Performed |
1994-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-07-17 | Perforation Treatment Performed - Cement Squeeze |
1994-07-17 | Plug Back Performed |
1994-07-20 | Perforation Treatment Performed - Jet Perforation |
1994-07-20 | Well Log Performed |
1994-07-21 | Perforation Treatment Performed - Fractured |
2010-05-20 | Perforation Treatment Performed - Cement Squeeze |
2010-05-20 | Plug Back Performed |
2010-05-27 | Perforation Treatment Performed - Jet Perforation |
2010-05-28 | Perforation Treatment Performed - Jet Perforation |
2010-05-28 | Well Log Performed |
2010-06-03 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-09-06 | Open Hole/Barefoot Completion | 1531.30 | 1561.80 | 0 |
1994-07-17 | Cement Squeeze | 1248.50 | 1258.50 | 0 |
1994-07-17 | Packing Device Capped w/Cement | 1245.00 | 1305.00 | 0 |
1994-07-20 | Perforation | 1233.00 | 1236.00 | 13 |
1994-07-21 | Fracture | 1233.00 | 1236.00 | 0 |
2010-05-20 | Cement Squeeze | 1233.00 | 1236.00 | 0 |
2010-05-27 | Perforation | 1313.80 | 1315.20 | 13 |
2010-05-28 | Perforation | 1308.50 | 1311.50 | 17 |
2010-06-03 | Fracture | 1308.50 | 1315.20 | 0 |
1951-09-09 | Resin-Gypsum Squeeze or Plug | 1555.10 | 1561.80 | 0 |
1965-10-07 | Packing Device Capped w/Cement | 1550.80 | 1552.30 | 0 |
1965-10-07 | Open Hole/Barefoot Completion | 1531.30 | 1550.80 | 0 |
1980-07-09 | Packing Device Capped w/Cement | 1511.20 | 1519.40 | 0 |
1980-07-12 | Perforation | 1248.50 | 1253.00 | 13 |
1988-08-31 | Perforation | 1248.50 | 1258.50 | 13 |
1988-09-01 | Acid Treatment | 1248.50 | 1258.50 | 0 |
1990-09-21 | Perforation | 1313.80 | 1315.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 1701 | 0.0 | 0.0 | 0.0 |
1968 | 1451 | 0.0 | 0.0 | 0.0 |
1969 | 1813 | 0.0 | 0.0 | 0.0 |
1970 | 2376 | 0.0 | 0.0 | 0.0 |
1971 | 3168 | 0.0 | 0.0 | 0.0 |
1972 | 4755 | 0.0 | 0.0 | 0.0 |
1973 | 3599 | 0.0 | 0.0 | 0.0 |
1974 | 4744 | 0.0 | 0.0 | 0.0 |
1975 | 5925 | 0.0 | 0.0 | 0.0 |
1976 | 5778 | 0.0 | 0.0 | 0.0 |
1977 | 5234 | 0.0 | 0.0 | 0.0 |
1978 | 2967 | 0.0 | 0.0 | 0.0 |
1979 | 7143 | 0.0 | 0.0 | 0.0 |
1980 | 8 | 0.0 | 0.0 | 0.0 |
For data sources see[5]