If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0264272909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.252218,"lon":-113.726623,"icon":""}]} |
Location: 00/09-29-026-27W4/0 | |
Location Alias: 00/09-29-26-27 W4M | |
Location Alias 2: 00/09-29-026-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 026 | |
Meridian: 4 | |
Range: 27 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 9-29-26-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0224080 | |
License Date: 1999-06-29 | |
License Status: Issued | |
Spud Date: 1999-08-27 | |
Final Drill Date: 1999-08-28 | |
Well Total Depth: 1179.00 m | |
Surface Hole Latitude: 51.252218 | |
Surface Hole Longitude: -113.726623 |
Date | Event |
---|---|
1999-02-05 | Well Log Performed |
1999-02-26 | Well Log Performed |
1999-06-29 | Obtained License |
1999-08-27 | Surface Casing Operation Performed |
1999-08-28 | Finished Drilling |
1999-08-29 | Production Casing Operation Performed |
1999-08-29 | Rig Released |
1999-08-29 | Well Mode changed to Drilled and Cased |
1999-09-02 | Well Log Performed |
1999-09-09 | Perforation Treatment Performed - Jet Perforation |
1999-09-09 | Well Log Performed |
1999-09-17 | Perforation Treatment Performed - Jet Perforation |
2000-07-05 | Perforation Treatment Performed - Fractured |
2000-08-29 | Well Began Production |
2000-08-29 | Well Fluid changed to Gas |
2000-08-29 | Well Mode changed to Flowing |
2000-10-24 | Perforation Treatment Performed - Jet Perforation |
2000-10-24 | Well Log Performed |
2005-05-01 | Well Fluid changed to Gas |
2005-05-01 | Well Mode changed to Suspended |
2005-10-15 | Perforation Treatment Performed - Jet Perforation |
2007-08-05 | Perforation Treatment Performed - Jet Perforation |
2007-08-17 | Perforation Treatment Performed - Fractured |
2007-10-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2007-10-10 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-09-09 | Perforation | 846.50 | 848.50 | 13 |
2007-08-05 | Perforation | 734.70 | 735.20 | 13 |
2007-08-05 | Perforation | 727.50 | 728.00 | 13 |
2007-08-05 | Perforation | 723.40 | 723.90 | 13 |
2007-08-05 | Perforation | 689.70 | 690.20 | 13 |
2007-08-05 | Perforation | 683.50 | 684.50 | 13 |
2007-08-05 | Perforation | 681.60 | 682.10 | 13 |
2007-08-05 | Perforation | 659.60 | 660.10 | 13 |
2007-08-05 | Perforation | 653.60 | 654.10 | 13 |
2007-08-05 | Perforation | 650.20 | 651.20 | 13 |
2007-08-05 | Perforation | 609.10 | 609.60 | 13 |
1999-09-17 | Perforation | 836.50 | 839.50 | 14 |
2007-08-05 | Perforation | 597.90 | 598.90 | 13 |
2007-08-05 | Perforation | 596.10 | 596.60 | 13 |
2007-08-05 | Perforation | 584.20 | 584.70 | 13 |
2007-08-05 | Perforation | 458.50 | 459.00 | 13 |
2007-08-05 | Perforation | 445.30 | 445.80 | 13 |
2007-08-05 | Perforation | 338.70 | 339.20 | 13 |
2007-08-05 | Perforation | 333.80 | 334.30 | 13 |
2007-08-05 | Perforation | 325.90 | 326.40 | 13 |
2007-08-17 | Fracture | 325.90 | 756.90 | 0 |
2000-07-05 | Fracture | 836.50 | 848.50 | 0 |
2000-10-24 | Perforation | 823.00 | 827.00 | 20 |
2000-10-24 | Perforation | 820.50 | 822.50 | 20 |
2000-10-24 | Perforation | 815.00 | 819.00 | 20 |
2005-10-15 | Perforation | 771.00 | 772.00 | 13 |
2007-08-05 | Perforation | 755.90 | 756.90 | 13 |
2007-08-05 | Perforation | 741.90 | 742.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 2246 | 0.0 | 0.0 | 0.0 |
2001 | 6716 | 0.0 | 0.0 | 0.0 |
2002 | 3333 | 0.0 | 0.0 | 0.0 |
2003 | 185 | 0.0 | 0.0 | 0.0 |
2007 | 1149 | 0.0 | 0.0 | 0.0 |
2010 | 8105 | 0.0 | 0.0 | 0.0 |
2011 | 8611 | 0.0 | 0.0 | 0.0 |
2012 | 4704 | 0.0 | 0.0 | 0.0 |
2013 | 8716 | 0.0 | 0.0 | 0.0 |
2014 | 8713 | 0.0 | 0.0 | 0.0 |
2015 | 8758 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]