X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284090106000

Well Details

Well ID: 0284090106000
Loading map...
Location: 00/06-01-028-09W4/0
Location Alias: 00/06-01-28-09 W4M
Location Alias 2: 00/06-01-028-09 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 09
Section: 01
County/Municipality: Special Areas No. 3
Well Name: CNRL HEATHDLE 6-1-28-9
Operator Name: Canadian Natural Resources Limited
License Number: 0069218
License Date: 1978-04-24
License Status: Suspension
Spud Date: 1978-06-29
Final Drill Date: 1978-07-05
Well Total Depth: 1032.40 m
Surface Hole Latitude: 51.363334
Surface Hole Longitude: -111.147253

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-04-24 Obtained License
1978-07-05 Finished Drilling
1978-07-06 Drill Stem Test Performed
1978-07-07 Drill Stem Test Performed
1978-07-08 Drill Stem Test Performed
1978-07-09 Production Casing Operation Performed
1978-10-14 Perforation Treatment Performed - Jet Perforation
1978-10-20 Well Mode changed to Drilled and Cased
1988-11-16 Well Began Production
1988-11-16 Well Fluid changed to Gas
1988-11-16 Well Mode changed to Flowing
1994-03-18 Well Fluid changed to Gas
1994-03-18 Well Mode changed to Suspended
1994-04-15 Well Fluid changed to Gas
1994-04-15 Well Mode changed to Flowing
1995-01-01 Well Fluid changed to Gas
1995-01-01 Well Mode changed to Suspended
1998-11-29 Well Log Performed
1998-11-30 Perforation Treatment Performed - Cement Squeeze
1998-12-03 Well Log Performed
1998-12-04 Perforation Treatment Performed - Jet Perforation
1998-12-09 Perforation Treatment Performed - Fractured
1999-01-10 Well Fluid changed to Gas
1999-01-10 Well Mode changed to Suspended
2005-07-25 Well Fluid changed to Gas
2005-07-25 Well Mode changed to Abandoned Zone
2005-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-27 Plug Back Performed
2005-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-28 Plug Back Performed
2005-10-26 Perforation Treatment Performed - Jet Perforation
2005-10-26 Well Log Performed
2005-10-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-14 Perforation 838.20 839.10 7
1998-11-30 Cement Squeeze 838.20 839.10 0
1998-12-04 Perforation 1018.00 1020.00 22
1998-12-09 Fracture 1018.00 1020.00 0
2005-07-27 Packing Device Capped w/Cement 1001.40 1009.40 0
2005-07-28 Packing Device Capped w/Cement 821.20 829.20 0
2005-10-26 Perforation 487.00 491.00 13
2005-10-27 Fracture 487.00 491.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1074 0.0 0.0 0.0
1989 5548 0.0 0.0 0.0
1990 4556 0.0 0.0 0.0
1991 5878 0.0 0.0 0.0
1992 5054 0.0 0.0 0.0
1993 4641 0.0 0.0 0.0
1994 4732 0.0 0.0 0.0

For data sources see[5]

References