If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284213412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.441028,"lon":-112.887242,"icon":""}]} |
Location: 00/12-34-028-21W4/0 | |
Location Alias: 00/12-34-28-21 W4M | |
Location Alias 2: 00/12-34-028-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 21 | |
Section: 34 | |
County/Municipality: Kneehill County | |
Well Name: MNK WAYNE 12-34-28-21 | |
Operator Name: Manitok Energy Inc. | |
License Number: 0205175 | |
License Date: 1997-08-20 | |
License Status: Amended | |
Spud Date: 1997-09-12 | |
Final Drill Date: 1997-09-23 | |
Well Total Depth: 1920.00 m | |
Surface Hole Latitude: 51.441028 | |
Surface Hole Longitude: -112.887242 |
Date | Event |
---|---|
1997-08-20 | Obtained License |
1997-09-14 | Surface Casing Operation Performed |
1997-09-15 | Direction Drilling Operation Performed - Deviate |
1997-09-23 | Finished Drilling |
1997-09-23 | Well Log Performed |
1997-09-23 | Well Mode changed to Drilled and Cased |
1997-09-24 | Well Log Performed |
1997-09-25 | Production Casing Operation Performed |
1997-09-25 | Rig Released |
1997-10-02 | Well Log Performed |
1997-10-06 | Well Log Performed |
1997-10-09 | Well Began Production |
1997-10-09 | Well Fluid changed to Crude Oil |
1997-10-09 | Well Log Performed |
1997-10-09 | Well Mode changed to Flowing |
1997-10-10 | Perforation Treatment Performed - Jet Perforation |
1997-10-11 | Well Log Performed |
1997-10-19 | Well Log Performed |
1997-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-10-27 | Well Fluid changed to Crude Oil |
1997-10-27 | Well Mode changed to Suspended |
1997-11-22 | Well Fluid changed to Crude Oil |
1997-11-22 | Well Mode changed to Flowing |
1997-12-11 | Well Log Performed |
1997-12-12 | Perforation Treatment Performed - Cement Squeeze |
1997-12-16 | Well Log Performed |
1997-12-17 | Perforation Treatment Performed - Selective Jet Perforations |
1997-12-18 | Perforation Treatment Performed - Selective Jet Perforations |
1997-12-19 | Well Log Performed |
2001-01-07 | Perforation Treatment Performed - Jet Perforation |
2001-01-08 | Well Log Performed |
2001-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-08-16 | Well Fluid changed to Crude Oil |
2002-08-16 | Well Mode changed to Pumping |
2003-06-16 | Perforation Treatment Performed - Jet Perforation |
2003-06-16 | Well Log Performed |
2003-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2019-04-30 | Well Fluid changed to Crude Oil |
2019-04-30 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-09-15 | 800.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-10 | Perforation | 1799.00 | 1813.00 | 17 |
2001-01-07 | Perforation | 1808.00 | 1811.00 | 18 |
2001-01-07 | Perforation | 1806.00 | 1807.00 | 18 |
2001-12-17 | Acid Treatment | 1806.00 | 1812.40 | 0 |
2003-06-16 | Perforation | 1804.00 | 1806.00 | 17 |
2003-06-16 | Perforation | 1799.00 | 1803.00 | 17 |
2003-06-18 | Acid Treatment | 1799.00 | 1812.40 | 0 |
2006-10-16 | Acid Treatment | 1799.00 | 1812.40 | 0 |
1997-10-20 | Acid Treatment | 1799.00 | 1813.00 | 0 |
1997-12-12 | Cement Squeeze | 1799.00 | 1813.00 | 0 |
1997-12-17 | Selective Jet Perforations | 1812.00 | 1812.00 | 2 |
1997-12-17 | Selective Jet Perforations | 1811.80 | 1811.80 | 2 |
1997-12-17 | Selective Jet Perforations | 1812.20 | 1812.20 | 2 |
1997-12-18 | Selective Jet Perforations | 1811.90 | 1811.90 | 2 |
1997-12-18 | Selective Jet Perforations | 1811.60 | 1811.60 | 2 |
1997-12-18 | Selective Jet Perforations | 1812.40 | 1812.40 | 2 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 504 | 0.0 | 0.0 | 0.0 |
1998 | 1218 | 0.0 | 0.0 | 0.0 |
1999 | 2702 | 0.0 | 0.0 | 0.0 |
2000 | 7814 | 0.0 | 0.0 | 0.0 |
2001 | 7149 | 0.0 | 0.0 | 0.0 |
2002 | 8178 | 0.0 | 0.0 | 0.0 |
2003 | 7902 | 0.0 | 0.0 | 0.0 |
2004 | 7128 | 0.0 | 0.0 | 0.0 |
2005 | 8407 | 0.0 | 0.0 | 0.0 |
2006 | 6572 | 0.0 | 0.0 | 0.0 |
2007 | 8521 | 0.0 | 0.0 | 0.0 |
2008 | 6531 | 0.0 | 0.0 | 0.0 |
2009 | 3438 | 0.0 | 0.0 | 0.0 |
2010 | 5958 | 0.0 | 0.0 | 0.0 |
2011 | 404 | 0.0 | 0.0 | 0.0 |
2012 | 7894 | 0.0 | 0.0 | 0.0 |
2013 | 6140 | 0.0 | 0.0 | 0.0 |
2014 | 7663 | 0.0 | 0.0 | 0.0 |
2015 | 8299 | 0.0 | 0.0 | 0.0 |
2016 | 8393 | 0.0 | 0.0 | 0.0 |
2017 | 7357 | 0.0 | 0.0 | 0.0 |
2018 | 6138 | 0.0 | 0.0 | 0.0 |
2019 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[6]