If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-121-24481 |
| County: |
| Municipality: |
| Operator Name: |
| Well Pad ID: |
| Farm/Lease Name: |
| First Permit Date: |
| Last Permit Date: |
| Spud Date: |
| Unconventional: |
| Horizontal: |
| Producing: |
| Violations: |
| Latitude: |
| Longitude: |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| 1397511382 | 2014-04-14 | My inspection finds the drilling rig, Patterson 343, ran 375' of 18.625" casing. Allied cemented the casing in place with 723 sks of class A cement. I witnessed 43 bbl of cement returns to surface. The string float did not hold so the well was shut in with 200 psi to prevent movement. | ||||
| 1547937433 | 2014-04-21 | My inspection today finds the drilling rig is preparing to drill the 12.25" section of the well. |