INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-2018341085
|
2003-01-13
|
|
Check this well because of spill in the past . Check dike to see if it is holding fluid and found that it should hold the oil if another spill occurs .
|
|
|
|
-213887457
|
2013-09-26
|
|
On location today to check the status. Plugged back from the Trempeleau on 9/26. Spoke to Josh Thompson, stated they found one bad joint 4 1/2 casing at 2500 feet. Replacing joint, going back in hole, scheduled to cement at 1:00 PM.
|
|
|
|
-962578987
|
2006-03-25
|
|
Had call from Steve Harley on oil leak that needed cleaned up.He said that it was less that 10 gallons and that more than 5 gallons had been recovered.He had booms and dike in place when I arrived.
|
|
|
|
1151435487
|
2006-04-05
|
|
Met with Steve Harley and advise that it was ok to pull the dam and the boom out. Clean up it done.
|
|
|
|
1152098949
|
2006-04-05
|
|
Advise that it was ok to pull dam and booms from site below dike .
|
|
|
|
11675968
|
2002-01-29
|
|
Arrived on site to find an oil spill had occurred and was being contained .The Ohio E.P.A. was on site [ Reginald Brown] and Wildlife officer[ Eric Ucker ] along with myself and Inspector [ Barry Grimm ] .We found that a leak had started on the back heat
|
|
|
|
11775969
|
2002-01-30
|
|
Arrived on site and met with Steve Harley to review clean up progress. We found that the earth dams could not contain the extra rain volume and had began to collapse .Steve then reconstructed the dam and the new dam should hold .Also walked down stream a
|
|
|
|
12275974
|
2002-01-31
|
|
Arrived today to find booms and earth dam in place and tanks removed from site. The area where tanks were located still need some clean up and soil removed .Work will be slow today because of moderate rains .
|
|
|
|
12775978
|
2002-02-04
|
|
There is no clean up under way at this inspection due to snow and high winds and below freezing temp.The clay which is to be placed inside the dike is frozen like a brick and can not be applied today.The cleanup is 99% done and should be complete this wee
|
|
|
|
1371883226
|
2003-01-13
|
|
Check this well to see if dike is holding fluid because it was the site of a spill a year ago . The dike is holding fluid and should hold the contents of a spill if it occurs again .
|
|
|
|
14475992
|
2002-02-20
|
|
Check on clean up progress and found that the dike had been reconstructed with clay and the tanks have been replace with new tanks. The earth dams are all that remain to be removed and the clean up will be finished.
|
|
|
|
16376023
|
2002-03-11
|
|
Check well to see if all of the equipment has been repaired and or replaced. Found earth dam still in place along with a few pillows. All of the above need removed.
|
|
|
|
170622640
|
2006-03-30
|
|
Clean up continues with boom and siphon dam in place.
|
|
|
|
24776072
|
2002-04-24
|
|
Found that dike has been rebuilt out of clay and that all dams up and down the stream have been removed.Also found that all booms and pillows have been disposed of . Tank battery is now back to conditions prior to tank leak.
|
|
|
|
58577621
|
2013-05-06
|
|
This is a producing pump unit. There are no apparent problems at this time.
|
|
|
|
869350624
|
2003-07-03
|
|
This well was the site of an old spill and I needed to check tanks after a good rain to see if they are holding fluid . They seem to be holding but my need more clay added .
|
|
|
|
iANGE000161
|
1997-07-28
|
|
|
|
|
|