If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21111 |
County: |
Municipality: |
Operator Name: |
Well Pad ID: |
Farm/Lease Name: |
First Permit Date: |
Last Permit Date: |
Spud Date: |
Unconventional: |
Horizontal: |
Producing: |
Violations: |
Latitude: |
Longitude: |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-136532672 | 2013-09-26 | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. | ||||
1353339014 | 2012-11-08 | Arrived on location for cementing of conductor pipe. Set 20 at 105' 226 sacks. | ||||
1359508836 | 2013-01-29 | I am on site this evening to witness the running and the cementing of the 13 3/8"diameter casing string. The 17.5" well was drilled to 610 ft. Nomac Drilling rig # 71 set 600 ft of casing and Baker Hughes Cement Service circulated cement to surface. While running the casing the landing joint was cross threaded and after 4 hours it was corrected. |