X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-25660

Well Details

Well ID: 34-169-25660
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1018306236 2011-07-05 Pits are closed. Area is mostly graded. Additional grading needed and then seeding required.
-1737024126 2014-06-09 This pumping unit well has no apparent problems at this time.
-967456513 2011-06-09 Maric Drilling at 1900 ft dusting on 7 7/8 hole.
1307537481 2011-06-06 Maric Drilling is moving rig in today and should start drilling Tuesday. Pits are being dug and working pit is lined with reinforced State approved liner.
1316518637 2011-06-06 Maric Drilling is moving rig in - Pits are lined with reinforced liners and are full of water.
1356911885 2013-06-28 This is a producing pump unit that has no apparent problems at this time.
1619837218 2011-06-13 Maric Drilling at 4480 soaping on 7 7/8 hole.
1693836233 2011-08-30 Pits are closed and area graded but not seeded.
1953066708 2011-06-10 Maric Drilling at 2550 ft dusting on 7 7/8 hole . Blowline chained and staked. Pit level and liners good.
2063089321 2011-06-07 Arrive with Inspector Chris Grimm, Shawn Murphy . Maric Drilling set 689 ft of 8 5/8 casing c/w 240 sks- Petroset -Mark - John- 11 hole to 740 ft. Good returns.
35488854 2011-06-20 Pit liners and level are good.
692069551 2011-10-31 This well is in production at this time. The Preliminary Restoration is not ready to pass as there needs to be more grading and seeding done. Also, the lease road needs redone before well can be accessed.
926438102 2011-06-07 Arrive for Surface cement job. Had Inspector Murphy and Grimm on site for training. Maric Drilling is at 740 ft which is TD on the 11 inch surface hole. During the drilling they lost 8 to 10 inches of freshwater. The surface hole was drilled on fluid , no conductor. Maric Drilling ran 689 ft of 8 5/8 casing set at 679 ft. c/w 240 sks - with 10 bbls return . Petroset- Mark- John