X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-21274

Well Details

Well ID: 34-019-21274
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1979-07-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.4428065244
Longitude: -81.2530925564

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1860500359 2006-02-07 Finish plugging the well today . Rip 4 1/2" casing at 4012' . Pump the lime plug 3850' to 3650' with 50sks cement . Bottom of the 8 5/8" casing from 1274' to 1074' with 54 sks. Surface plug from 200' to 0' with 54 sks . Petroset did the cementing . No violations at this time .
1143214427 2006-03-24 Inspection revealed that the plugging pit has been closed and the location graded . The well was plugged on Feb. 7th , 2006. The tank battery will remain because it is being used by another Clark Morrison well . No violations at this time .
1443338584 2006-02-06 Run tubing back into the well and then pump the Clinton plug thru tubing . Petroset pumped 25 sks class A cement from 5489 to 5289 . No violations at this time .