| Well ID: 34-067-21075 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2787711187,"lon":-80.8873981091,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2012-07-31 | |
| Unconventional: | |
| Horizontal: | |
| Producing: No | |
| Violations: 2 | |
| Latitude: 40.2787711187 | |
| Longitude: -80.8873981091 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| -1580448390 | 2012-08-02 | I am on site today to check on theTop Hole auger rig and found that they are at 85 ft and having problems with water and hole collapse. Rocks are falling in along with a large amount of water starting at 15 ft. | ||||
| -2120560276 | 2012-08-01 | Repairs have been made to the Top Hole auger rig. They will begin drilling again and cement around 4 pm. | ||||
| -540306963 | 2012-08-14 | Nabors rig # M 60 is moving on location and has rig in the air. Most of the equipment is in place and they could begin drilling soon. 15 ft French drain has been completed along the hill side and out to the front of the location. | ||||
| 1346750554 | 2012-09-04 | I am on site today to witness the running and cementing of the 13 5/8 inch casing string. Nabors M60 set 1710 ft of 13 5/8 inch casing cemented by Halliburton Cementing. For more information refer to the Cement Casing ticket which will follow upon completion of drilling and cementing of all the casing strings. | ||||
| 1346757434 | 2012-08-29 | On location for cementing of surface pipe crew having trouble landing pipe. May be in an old mine I will check mine maps in phila office. | ||||
| 1363225847 | 2012-07-31 | The Top Hole auger rig is at 80 ft and is broke down for repairs. Start again Weds and will contact me with cement schedule. | ||||
| 1510363026 | 2012-08-07 | Met on site today with Supervisor Gene Chini and Mines Supervisor Wayne Schalk. Hess Ohio had a core rig on site and we did collect at least 4 samples around the conductor. Supervisor Wayne Schalk advised that a 15 ft deep diversion ditch be cut along the uphill side of the location. A french drain type system would need to follow the cut and carry the water around the location to prevent it from running down along side of the conductor hole. | ||||
| 246907022 | 2012-07-31 | I am on site today with the Top Hole drilling rig and crew. They are to drill and set conductor today and cement the casing around 4 pm. | ||||
| 313766852 | 2012-08-06 | Met on site with Larry Smith and issued verbal notice for not contacting me about the cementing of the Conductor String. Conductor has been set and cemented. During my inspection I found that the Conductor hole has collapsed 15 ft out from casing. Water is running down from 15 ft and is cutting away at the pad and making the pad soft. I contacted Supervisor Gene Chini and set up a meeting with Wayne Schalk and Gene Chini to review problems with the pad. | NONE | |||
| 313766852 | 2012-08-06 | Met on site with Larry Smith and issued verbal notice for not contacting me about the cementing of the Conductor String. Conductor has been set and cemented. During my inspection I found that the Conductor hole has collapsed 15 ft out from casing. Water is running down from 15 ft and is cutting away at the pad and making the pad soft. I contacted Supervisor Gene Chini and set up a meeting with Wayne Schalk and Gene Chini to review problems with the pad. | NONE(S) | |||
| 317656371 | 2012-08-29 | On location to cement surface pipe. 325'of 20, had trouble with landing pipe no mine in area got cement to surface. | ||||
| 432451113 | 2014-01-29 | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. | ||||
| 99260386 | 2012-08-28 | Arrived on location and found rig drilling at 300', no violations at this date. |