If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-23745 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.7362354429,"lon":-81.4267883519,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1990-05-10 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.7362354429 | |
Longitude: -81.4267883519 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1921117564 | 2004-03-30 | No violations noted,will need dike constructed around 100bbl tank when SPCC regs go into effect.Talked to Gary Lemmon company field supervisor@330-201-0332 about getting dikes on production tanks completed. | ||||
1340816788 | 2012-06-27 | Inspection of the well head found 4.5 production casing, 1.5 tubing & rods with the production valves open and a pumping unit in place. A 100 barrel tank and separator are present on location near the well head. Inspector will note that contact was made with company representative Gary Lemon about putting up proper well identification. | ||||
14248301 | 2012-11-19 | My inspection today finds the well is equipped with 4.5" casing, 1.5" tubing, rods, and a pump jack. The production valves are open. The tank battery consists of one 100 bbl tank and a separator. The tank has the proper identification and is located within a dike. The meter is located off site. | ||||
14316 | PASSED Y WITNESSED 10/20/95 INSPECTOR TED DOBBIN DATE 10/2019/95 DATA FROM OLD VAX INFO |