X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-23570

Well Details

Well ID: 34-119-23570
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1975-04-22
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8118142901
Longitude: -82.0353279984

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1397187957 2009-07-21 Rods and tubing removed from well. Well is shut in. Will call
-1534199636 2011-12-01 Rig in over well working on well.
-1854146835 2013-04-19 I met with Knox energy at yard and discussed the restoration requirements.
-900598426 2008-04-03 Shut in. P & A permit in hand.
1012883983 2013-07-17 Passes the requirements of 1509.072B.
1529503610 2011-12-16 Knox has been on location since 11-29-11. This is an Emergency plug job.Since rig has been milling for 2 weeks and no progress Company will plug back from 805 to surface.Company ran 2 3/8upset tubing to 800'.Set plug from 800-500'.Then set 500'-250'.Pulled up and set heavy plug and shut down.Will tag on 12-19-11.Ran total of 180 sks.
1817892570 2013-04-15 Final inspection did not pass on day of 4-15-13 by Patrick Shreve because of tank and line still in place at site. I will call company.
347759731 2011-12-19 Rig tagged plug at 280'.Cemenco set top plug with 44sks of Cement at 4%gel and Cotton seed hulls.Well plugged on this date.Emergency plug job completed.
500376105 2010-10-20 Well is shut-in. Have plug back permit in hand but there has been no activity. Called Terry and he said it's on the board to either plug it or plug it back shortly. Will hold off on compliance notice for now.
PL8901 Preliminary Restoration done information from Data Point