If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21212 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.300502767,"lon":-80.987910848,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-08-26 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.300502767 | |
Longitude: -80.987910848 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1598791270 | 2014-01-17 | On the day of my inspection the site passed preliminary restoration according to 1509.072A. | ||||
1377091283 | 2013-08-21 | I am on site today to check on the H & P Drilling Rig # 287 and found them 50% rigged up. It looks like Saturday to Sunday before they start drilling. | ||||
1377697556 | 2013-08-28 | I received a call that from Bill Calobreves that he would be cementing starting at 6:00 am. I arrived to witness the cementing of the 24" inch diameter casing string. After a short time they broke down and are 4 joints off bottom. I advised Bill to call me when he had casing on bottom. | ||||
1377713336 | 2013-08-28 | I returned to the site and found that H &P Drilling has installed the casing and now we are waiting on Halliburton. They drilled a 27" inch diameter hole to 343 ft and set 346 ft of 24" inch diameter casing. Halliburton c/w 250 sks at 15.8 | ||||
1477721899 | 2013-09-09 | I am on site today and witnessed that H & P Drilling Rig 287 drilled a 17.5" diameter hole to the depth of 2097' and set 2096' of new 13.375" J-55 61#/ft. casing. Baker Hughes Oilfield Operations Inc. was on site gained circulation with 55 bbls of fresh water, pumped 25 bbls of gel, 5 bbls of fresh water spacer and cemented casing with 1577 sacks of Class A cement with 2% Cacl. Displaced plug and landed at 880 psi bumped it to 1379 psi and held for 5 minutes. Had good returns 63 bbls and cement stayed to surface. | ||||
723074918 | 2013-08-26 | Hess Ohio called me Sunday to inform me that the well would spud last night. I arrived today and found that they had a problem with the pump and would spud tonight some time. |