If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-121-24488 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.935966854,"lon":-81.3161047446,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2014-04-17 | |
| Unconventional: | |
| Horizontal: | |
| Producing: No | |
| Violations: 0 | |
| Latitude: 39.935966854 | |
| Longitude: -81.3161047446 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| -2023847995 | 2014-06-23 | I am onsite to witness the cement operations for the surface casing. Dallas Morris Drilling ran 359' of 18.625" casing. Allied cemented the casing in place with class A cement. I witnessed good returns to surface. | ||||
| -209412986 | 2014-07-01 | I am on site to witness the cementing operations on the second intermediate casing string. Halliburton is preparing to cement 7021' of 9.625" casing in place with 940 sacks of Extendacem ? and 280 sacks of Halcem ?. Displacement is calculated at 544 barrels. | ||||
| 900891772 | 2014-06-23 | My inspection finds the rig is drilling around a broken 17.5" hammer that was lost in the hole. Dallas Morris rig 24 is drilling at a depth of 1323' with directional tools. |