If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24368 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.1661375407,"lon":-81.3118072129,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-23 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.1661375407 | |
Longitude: -81.3118072129 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-732223972 | 2014-07-28 | On the day of my inspection I witnessed that Whipstock Ohio Drilling Rig #1 had drilled a 23 inch diameter surface hole to the depth of 216 feet and were broke down. The main hydraulic motor had failed and the rig was waiting on a new motor. | ||||
1406925475 | 2014-08-01 | On the date of inspection I witnessed the cementing of the 18.625 inch 87.5 lbs/ft. casing. Carrizo Company Man on site was Wayne Simon. The Whipstock Ohio #1 rig drilled a 23 inch diameter hole to a Total Depth of 520 feet with a floating shoe at a depth of 498 feet. Baker Hughes pumped 480 sacks of lead Class A cement with a weight of 15.6ppg and yield of 1.20. Baker Hughes pumped 123 sacks of tail cement with a weight of 15.6ppg and a yield of 1.21. 30 bbl of cement returned to surface and stayed at surface while I was on site. | ||||
1408048323 | 2014-08-14 | On the day of my inspection I witnessed that Whipstock Ohio Drilling Rig #1 had drilled a 12.5 inch diameter hole to the depth of 6680 feet and Wyoming casing crew ran 6600 feet of 9.625 inch 40#/ft. L-80 casing. Baker Hughes was on site and was rigging up their cement head in preparation of the upcoming 2-stage cement job. | ||||
1691666840 | 2014-08-11 | On the day of my inspection I witnessed that Whipstock Ohio Drilling Rig #1 was drilling a 12.25 inch diameter hole at a depth of 6120 feet with a planned td of 6680 feet with casing and cementing to follow. Upon completion of the second intermediate string the rig will be moving to the Mohorovich Pad. |