Well Details

Well ID: 34-059-24174
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-12-08
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.06380078
Longitude: -81.6478431339

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-127974972 2011-01-19 On site to witness frac job 1981 psi was breakdown pressure and maximum pressure was noted at 2107psi a total of 74,652 gal of water was used and 48,000# of 20/40 sand and INSP was 780psi and after 10 min 507 psi was noted, after removing trucks from site flow back process began.
1291838825 2010-12-08 Stopped by drill site to check on pit construction and site work being preformed, Warren Drilling rig#7 moving in on site preparing to drill new well, dozer operator stated that they may possibly get started to drill later today.
1292448699 2010-12-15 Stopped by drill rig for status check they were drilling@5580' soaping using Varel PDC bit 7.875 hole.
1292523299 2010-12-16 Inspection revealed that drill rig was drilling@6630' and top of Trenton lime was at 6318' they anticipate topping Beekmantown later tonight.
1292621340 2010-12-17 Well drilled to total depth of 7267',top of Beekmantown was at 7108' and Trenton lime top was at 6298' well owner stated that they would possibly want to plug well back to Clinton Sand and produce it if E-log indicated it would be productive.
1308867453 2011-06-23 Restoration work at site satisfactory pit has been filled and site reclaimed and well is equipped with pumping unit and tubing and rods and 1-100 bbl tank with dike in place.
1352287207 2010-12-06 Stopped by drill site to check on pit construction and all appeared to be OK, and observed Warren Drilling moving in on site to start new well.
1436282946 2010-12-13 Stopped at drilling rig for update they were drilling lime@4090' and top of lime was 3249' still dusting at this point in hole.