If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 015-20889 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.784002,"lon":-76.192586,"icon":""}]} |
County: Bradford | |
Municipality: Stevens Township | |
Operator Name: SOUTHWESTERN ENERGY PROD CO | |
Farm/Lease Name: CHAMBERLIN MEYER G U 1H | |
First Permit Date: 2010-05-12 | |
Last Permit Date: 2010-05-12 | |
Spud Date: 2010-09-07 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 41.784002 | |
Longitude: -76.192586 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1962621 | 2011-03-31 | No Violations Noted | During fract operation the hammer plug failed, which released fract fluid and sand to the pad. Vac truck cleaned area. Material restricted to the pad. No streams or water affected. Just finished fracting the 3H. Moving over to fract the 2H. Planning on fract in 11 stages which will take approx 4 days and will then to move to the 1H. | |
2122919 | 2012-10-15 | No Violations Noted | Well in production. 602.26 tubing pressure. No other gauges. 3 treaters, 2 condensate on location. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 894233.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 1077959.0 | 174.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 1391985.0 | 177.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 396531.0 | 68.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-1 | FLOWBACK FRACTURING SAND | 1.03 | Tons | LANDFILL | 101247 | KEYSTONE SANITARY LANDFILL | DUNMORE | PA |