{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.134722,"lon":-79.364172,"icon":""}]} |
| County: Westmoreland | |
| Municipality: Donegal Township | |
| Operator Name: WPX ENERGY APPALACHIA LLC | |
| First Permit Date: 2011-06-06 | |
| Last Permit Date: 2011-06-06 | |
| Spud Date: None | |
| Unconventional: Yes | |
| Horizontal: Yes | |
| Violations: None | |
| Latitude: 40.134722 | |
| Longitude: -79.364172 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1994376 | 2011-06-21 | No Violations Noted | Site visit was part of routine inspection. Road, pad and pits were under construction.
Heavy rains had compromised some BMPs. HRI (construction contractor) was actively upgrading or adding additional measures to prevent erosion from the site. It was suggested to add diversion ditches and sediment traps to deal with the water from the site. No violations noted at this time. |
|
| 2012821 | 2011-10-21 | No Violations Noted | Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site.
Haliburton was on site. Cementing taking place. BMPs around drill pad and impoundment were sound. Pits had adequate freeboard. Secondary containment was in place. No violations noted at this time. |
|
| 2026798 | 2011-12-05 | No Violations Noted | WELL PERMITED BUT NOT DRILLED. E&S AND PITS, GOOD | |
| 2034566 | 2012-01-11 | No Violations Noted | Site visit was part of routine inspectiion.
One well was drilled on the pad. Rig had been removed. BMPs in place. A rock lined ditch and sediment trap were being installed on far slope (north) of pad. This will eleviate the erosion issues on this side of the pad. All changes should be red marked on the e&s plan. All other BMPs were in place and appeared to be working properly. Three potential spills were spotted on the pad. One appeared to be an oil based mud. Two others appeared to be a fuel sourec, possibly diesel. These areas need to be exavated, and removed. Spoke to Mike Cribbs (WPX). Water quality specialist Rich Thomas was present during inpection. No violations noted at this time. |
|
| 2100439 | 2012-09-18 | No Violations Noted | Company drained impoundment. No issues noted. |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|