37-051-00118

Well Details

Well ID: 37-051-00118
Loading map...
County: Fayette
Municipality: German Township
Operator Name: THE PRODUCTION CO LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date: 1856-08-15
Last Permit Date: 1856-08-15
Spud Date: 1800-01-01
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 6
Latitude: 39.91975
Longitude: -79.849944

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1991-0 2325.0 364.0 0.0 0.0 0.0 0.0
1996-0 1921.0 365.0 0.0 0.0 0.0 0.0
1996-0 0.0 0.0 0.0 0.0 0.0 0.0
1997-0 0.0 0.0 0.0 0.0 0.0 0.0
1998-0 30.0 365.0 0.0 0.0 0.0 0.0
1999-0 0.0 0.0 0.0 0.0 0.0 0.0
2003-0 2648.87 365.0 0.0 0.0 0.0 0.0
2004-0 3315.0 365.0 0.0 0.0 0.0 0.0
2005-0 1972.0 365.0 0.0 0.0 0.0 0.0
2007-0 1043.0 365.0 0.0 0.0 0.0 0.0
2008-0 550.0 365.0 0.0 0.0 0.0 0.0
2009-0 182.0 365.0 0.0 0.0 0.0 0.0
2010-0 0.0 365.0 0.0 0.0 0.0 0.0
2011-0 12.0 365.0 0.0 0.0 0.0 0.0
2012-0 12.0 365.0 0.0 0.0 0.0 0.0
2013-0 12.0 365.0 0.0 0.0 0.0 0.0
2014-0 12.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1852514 2009-12-16 Violation(s) Noted 578592 105GEN - Encroachment-General No E&S control measures were in place where the pipeline crossed the stream.
1852514 2009-12-16 Violation(s) Noted 578592 105GEN - Encroachment-General No E&S control measures were in place where the pipeline crossed the stream.
1852514 2009-12-16 Violation(s) Noted 578593 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) No stabilization measures were taken on the cleared pipeline area to prevent erosion. There were not any erosion and sedimentation (﾿E&S﾿) control measures where the new pipeline crossed a creek.
1852514 2009-12-16 Violation(s) Noted 578593 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) No stabilization measures were taken on the cleared pipeline area to prevent erosion. There were not any erosion and sedimentation (﾿E&S﾿) control measures where the new pipeline crossed a creek.
1852514 2009-12-16 Violation(s) Noted 578594 102.4NOPLAN - No E&S plan developed, plan not on site No E&S control plan for the project was available on the work site.
1852514 2009-12-16 Violation(s) Noted 578594 102.4NOPLAN - No E&S plan developed, plan not on site No E&S control plan for the project was available on the work site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Accelerated erosion and sedimentation occurred and was transported off the site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Accelerated erosion and sedimentation occurred and was transported off the site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580130 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Accelerated erosion and sedimentation occurred and was transported off the site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131 102.4INADPLN - E&S Plan not adequate Best management control measures were not adequate for the well site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131 102.4INADPLN - E&S Plan not adequate Best management control measures were not adequate for the well site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580131 102.4INADPLN - E&S Plan not adequate Best management control measures were not adequate for the well site.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132 102.4NOPLAN - No E&S plan developed, plan not on site No E&S control plan for the project was available on the work site for review.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132 102.4NOPLAN - No E&S plan developed, plan not on site No E&S control plan for the project was available on the work site for review.
1858651 2010-01-20 Violation(s) Noted On January 20, 2010, I conducted a routine inspection at the site to see if E&S control measures were installed. The E&S BMPs that were installed entailed staked hay bales that were not entrenched into the ground as called for in the DEP﾿s Erosion and Sediment Pollution Control Program Manual. As a result, the run off that occurred from the previous rain/snow melt event undermined the hay bales. It was evident that a large amount of sediment left the site. The road side trenches were filled with mud and the farm fields across the streets had mud conveyed across them via the culverts under Ralf-New Salem Road and Shimpko Hollow Road. It was apparent that some of the sediment transported off site at the Shimpko Hollow Road pipeline crossing went into an unnamed tributary to Dunlap Creek. An E&S control plan for the pipeline project was not available on site to review. 580132 102.4NOPLAN - No E&S plan developed, plan not on site No E&S control plan for the project was available on the work site for review.
1864936 2010-01-20 No Violations Noted Inspection related to the gas line replacement that this well is attached to.
1864965 2010-02-03 No Violations Noted Inspection related to the gas line replacement that this well is attached to.

For data sources see[3]