X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-023-20127

Well Details

Well ID: 37-023-20127
Loading map...
County: Cameron
Municipality: Shippen Township
Operator Name: ENDEAVOUR OPERATING CORP
Well Pad ID: 149007
Farm/Lease Name: PARDEE & CURTIN LUMBER CO C 9H
First Permit Date: 2009-07-16
Last Permit Date: 2009-07-16
Spud Date: 2009-09-23
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 22
Latitude: 41.455678
Longitude: -78.268257

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 26320.0 52.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 104037.0 184.0 0.0 0.0 0.0 0.0
2010-2 104037.0 184.0 0.0 0.0 0.0 0.0
2011-1 122646.0 181.0 0.0 0.0 0.0 0.0
2011-2 65307.0 182.0 0.0 0.0 0.0 0.0
2012-1 61948.0 175.0 0.0 0.0 0.0 0.0
2012-2 45898.4 184.0 0.0 0.0 0.0 0.0
2013-1 41617.0 181.0 0.01 1.0 0.01 1.0
2013-2 33658.0 179.0 0.01 1.0 0.01 1.0
2014-1 7376.0 53.0 0.0 0.0 0.0 0.0
2014-2 44330.0 149.0 0.0 0.0 0.0 0.0
2015-02 5231.0 12.0 0.0 0.0 0.0 0.0
2015-01 4787.0 16.0 0.0 0.0 0.0 0.0
2015-03 5446.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-3 FRACING FLUID WASTE 26.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2010-3 PRODUCED FLUID 443.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2010-2 PRODUCED FLUID 6.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2011-1 PRODUCED FLUID 8.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2011-2 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2012-2 PRODUCED FLUID 2.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2013-1 PRODUCED FLUID 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2013-2 PRODUCED FLUID 1.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2014-1 PRODUCED FLUID 329.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784 WASTE TREATMENT CORPORATION WARREN PA
2014-2 PRODUCED FLUID 303.0 Bbl INJECTION DISPOSAL WELL 34-133-20525 BLAZEK #2 SWIW HIRAM OH
2014-2 PRODUCED FLUID 4.0 Bbl INJECTION DISPOSAL WELL 34-133-24096 GROSELLE INECTION WELL # 2 GARRETTSVILLE OH
2014-2 PRODUCED FLUID 550.0 Bbl INJECTION DISPOSAL WELL 34-155-23196 NATALE #1 (SWIW #28) WARREN OH
2014-2 PRODUCED FLUID 330.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 3.0 Bbl STORAGE PENDING DISPOSAL OR REUSE TEMP ON SITE STORAGE PENDING DISPOSAL OR REUSE PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1832738 2009-09-17 No Violations Noted rig circulating hole to run pipe. rig at 1088 ft ..they were lining a water confinement pit during visit. ** e&s plans for location and water confinement ONLY told jon he needs better e&s and must include roads also.well site sign up and poor e&s plans there also.
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572784 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 691.307 & 78.57(a) for unpermitted discharge of industrial waste
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572784 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 691.307 & 78.57(a) for unpermitted discharge of industrial waste
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572785 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith CACP w/$8,000 penalty finalized 7/30/10, case closed. 30 hr time lapse between event and 1st report. Report from Drill rig not operator
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572785 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith CACP w/$8,000 penalty finalized 7/30/10, case closed. 30 hr time lapse between event and 1st report. Report from Drill rig not operator
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572786 401CSL - Discharge of pollultional material to waters of Commonwealth. CACP w/$8,000 penalty finalized 7/30/10, case closed. 402CSL Potential Pollution
1832875 2009-09-30 Violation(s) Noted 48bbls of drilling mud released to well pad. No mud left site or into streams. 30hr time lapse between release and report. Report from Patterson Drilling not operator. Cert Mail NOV sent10/05/09. Inspection report related to Mark Barbier 10/01/2009 inspection. 572786 401CSL - Discharge of pollultional material to waters of Commonwealth. CACP w/$8,000 penalty finalized 7/30/10, case closed. 402CSL Potential Pollution
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572794 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) CACP w/$8,000 penalty finalized 7/30/10, case closed. silt fence not installed properly. BMPs not aduquate to adress accelerated eosion
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572794 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) CACP w/$8,000 penalty finalized 7/30/10, case closed. silt fence not installed properly. BMPs not aduquate to adress accelerated eosion
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572795 102.4INADPLN - E&S Plan not adequate CACP w/$8,000 penalty finalized 7/30/10, case closed. generic plan does not adress any run-off or acclerated erosion.
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572795 102.4INADPLN - E&S Plan not adequate CACP w/$8,000 penalty finalized 7/30/10, case closed. generic plan does not adress any run-off or acclerated erosion.
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572796 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of mud released from seperation system 78.57(a)
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572796 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of mud released from seperation system 78.57(a)
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572797 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of wash water degreaser, oil/grease release 78.57(a)
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572797 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of wash water degreaser, oil/grease release 78.57(a)
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572798 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of wash water and 5-10bbls of mud
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572798 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith CACP w/$8,000 penalty finalized 7/30/10, case closed. 5-10bbls of wash water and 5-10bbls of mud
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572799 401CSL - Discharge of pollultional material to waters of Commonwealth. CACP w/$8,000 penalty finalized 7/30/10, case closed. CSL402 potential pollution not 401. Both wash water and drilling mud
1832882 2009-10-01 Violation(s) Noted the violations cited on this inspectio nrecord are sperate from those cited on jim Cover inspection 9/30/2009 Inspection record:1832875. NOV sent 10/05/2009 for both inspections.MAB 572799 401CSL - Discharge of pollultional material to waters of Commonwealth. CACP w/$8,000 penalty finalized 7/30/10, case closed. CSL402 potential pollution not 401. Both wash water and drilling mud
1835470 2009-10-08 Violation(s) & Recurring Violations 573421 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan
1835470 2009-10-08 Violation(s) & Recurring Violations 573422 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution 30 gal fuel spilled on ground
1835533 2009-10-08 Violation(s) Noted operator had 30 gallon diesel fuel spill on ground and also found diesel fuel in drill pit also. ALSO 3rd time operator was ask for ppc plan and is NOT on location !!!!! 573430 78.55 - No Control and Disposal/PPC plan or failure to implement PPC plan 3rd time ppc was ask for and not on location
1835533 2009-10-08 Violation(s) Noted operator had 30 gallon diesel fuel spill on ground and also found diesel fuel in drill pit also. ALSO 3rd time operator was ask for ppc plan and is NOT on location !!!!! 573431 401CSL - Discharge of pollultional material to waters of Commonwealth. 30 gal diesel fuel on ground
1835533 2009-10-08 Violation(s) Noted operator had 30 gallon diesel fuel spill on ground and also found diesel fuel in drill pit also. ALSO 3rd time operator was ask for ppc plan and is NOT on location !!!!! 573432 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
1852382 2009-12-23 Violation(s) Noted 578569 102.4INADPLN - E&S Plan not adequate the embankment around the edge of the site was extremely steep and could easily erode, no signs of vegetation for stability seen as part of an E&S control measure
1873820 2010-03-25 Outstanding Violations - Viols Req'd 584276 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Silt fence in place along pipeline cut through the woods, no work done yet on embankment
1874087 2010-03-30 No Violations Noted
1906334 2010-08-05 Violation(s) Noted >5 acres disturbance and no ESCGP, accelerated erosion, pit has holes in liner, waste lying around site 593217 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1906334 2010-08-05 Violation(s) Noted >5 acres disturbance and no ESCGP, accelerated erosion, pit has holes in liner, waste lying around site 593218 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected.
1906334 2010-08-05 Violation(s) Noted >5 acres disturbance and no ESCGP, accelerated erosion, pit has holes in liner, waste lying around site 593219 51017 - Administrative Code-General 35 PS 6018.301
1906334 2010-08-05 Violation(s) Noted >5 acres disturbance and no ESCGP, accelerated erosion, pit has holes in liner, waste lying around site 593220 102.4INADPLN - E&S Plan not adequate
1909250 2010-05-20 No Violations Noted
1929870 2010-11-16 Violation(s) Noted Well site restoration is not complete 600098 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production.
1944064 2011-01-20 Violation(s) Noted 605473 CSL401CAUSPL - Polluting substance(s) allowed to discharge into Waters of the Commonwealth
1962082 2011-03-31 No Violations Noted
1969357 2011-04-25 No Violations Noted
1995020 2011-08-11 No Violations Noted
2046928 2012-02-28 No Violations Noted
2073755 2012-05-16 No Violations Noted
2112176 2012-10-02 No Violations Noted
2116039 2012-11-15 No Violations Noted
2138944 2013-01-29 No Violations Noted
2194876 2013-07-24 No Violations Noted
2219335 2013-11-06 No Violations Noted
2251647 2014-03-06 No Violations Noted
2339655 2015-01-23 No Violations Noted At the time of inspection cloudy sky

For data sources see[3]

References