X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20467

Well Details

Well ID: 42-081-20467
Loading map...
County: Lycoming
Municipality: Cogan House Township
Operator Name: ANADARKO E&P CO LP
Farm/Lease Name: DAVID O VOLLMAN A 2H
First Permit Date: 2010-12-28
Last Permit Date: 2010-12-28
Spud Date: 2011-01-12
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 1
Latitude: 41.433205
Longitude: -77.208569

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1951579 2011-02-22 No Violations Noted
1968987 2011-04-27 No Violations Noted
2006218 2011-09-28 No Violations Noted
2010578 2011-10-06 Violation(s) Noted 622147
2072940 2012-05-31 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 517492.0 182.0 0.0 0.0 0.0 0.0
2012-1 160646.0 32.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 6177.26 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2011-1 DRILL CUTTINGS 782.43 Tons LANDFILL THR029 TUNNELL HILL RECLAMATION LANDFILL NEWLEXINGTON OH
2011-1 DRILL CUTTINGS 22.89 Tons LANDFILL 101397 VIOLIA ES GREENTREE LANDFILL PA
2011-1 DRILL CUTTINGS 257.27 Tons LANDFILL 100955 WAYNE TOWNSHIP LANDFILL (CLINTON COUNTY) MC ELHATTAN PA
2012-1 FLOWBACK FRACTURING SAND 22.42 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA
2012-1 PRODUCED FLUID 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR0123 HYDRO RECOVERY - BLOSSBURG BLOSSBURG PA

References