If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24219 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01196512,"lon":-81.46478561,"icon":""}]} |
| County: Guernsey | |
| Municipality: | |
| Operator Name: DEVON ENERGY PRODUCTION CO | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2012-08-03 | |
| Unconventional: No | |
| Configuration: Vertical | |
| Well Status: | |
| Violations: 0 | |
| Latitude: 40.01196512 | |
| Longitude: -81.46478561 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2013-12 | 0.0 | 0.0 | ||||
| 2012-0 | 0.0 | 2149.0 | ||||
| 2013-12 | 0.0 | 0.0 | ||||
| 2013-3 | 0.0 | 0.0 | ||||
| 2013-6 | 0.0 | 0.0 | ||||
| 2013-9 | 0.0 | 0.0 | ||||
| 2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| 2014-3 | 0.0 | 0.0 | 0.0 | 0.0 | ||
| 2014-2 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| -1063289078 | 2012-08-13 | Received call from local office of possible complaint of sediment had overrun silt fence and had entered adjacent property inspected site and found work crew correcting problems with faulty silt fence and applying seed and mulch to edges of drill pad to help prevent any further problems with erosion. | ||||
| 1099288609 | 2012-09-19 | Inspection revealed that driller was drilling on fluid at 1175' and they should TD surface hole this evening and possibly be ready to cement it in place in the morning. | ||||
| -1668945642 | 2014-01-09 | The site passed preliminary restoration according to 1509.072A. | ||||
| -1867334320 | 2012-10-09 | On site to witness plugging back of said well they drilled to a total depth of 7350' and logged well and then they ran drill string back into well to set 1200' cement plug, once cement is set up they will go back into well and then proceed to drill horizontal. | ||||
| 2016132488 | 2012-10-21 | Total depth@11,538' operator ran 11,538' of 5.5 casing and two stage cementing tool@5550' and Halliburton cemented casing in place. | ||||
| 334973743 | 2015-01-22 | On the day of my inspection following up on Devon Energy | ||||
| -978483319 | 2014-01-09 | The site passed preliminary restoration according to 1509.072A. |
For data sources see[2]