Well ID: 34-059-24230 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.90147465,"lon":-81.65281725,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: EQT PRODUCTION COMPANY | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-11-10 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.90147465 | |
Longitude: -81.65281725 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 32863.0 | 3960.0 | ||||
2013-9 | 29254.0 | 6223.0 | ||||
2014-1 | 20034.0 | 64.0 | 2018.0 | 64.0 | ||
2014-2 | 33561.0 | 91.0 | 2862.0 | 91.0 | ||
2014-3 | 22389.0 | 85.0 | 1472.0 | 85.0 | ||
2014-4 | 20526.0 | 92.0 | 1568.0 | 92.0 | ||
2015-1 | 16839.0 | 80.0 | 906.0 | 80.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1125116829 | 2012-11-07 | Met with Company and Contractors in a Pre-spud Meeting. Savanna Rig 654 is rig drilling well. The pad has been completed and all erosion controls are in place. | ||||
-1226811114 | 2014-01-28 | The site passed preliminary restoration according to 1509.072A. | ||||
1353537739 | 2012-11-21 | Inspection revealed that drilling rig has reached 5555' and were cleaning well bore to prepare to log and side wall core and then run 9.625 casing and cement it in place. | ||||
1353973624 | 2012-11-26 | Stopped by drilling rig for update they were coring Utica Shale@6370' and preparing to pull first 60' core barrel and then they plan on coring three more runs then log well and then plug back well to drill horizontal. | ||||
1354037855 | 2012-11-27 | On the day of my inspection the rig is currently drilling the vertical hole for the core plug. | ||||
1355238969 | 2012-12-11 | Pryor to my inspection I received a phone call from the company man Darrel Bradley letting me know the Savanna Rig #654 made there TD mark on the date of 12/10/2012. On the day of my inspection I witnessed the rig crew removing the drill pipe and running the five inch back in the well bore. | ||||
1358265959 | 2013-01-15 | On the day of my inspection the pit was being solidified. | ||||
1375968526 | 2013-08-08 | On the day of my inspection I witnessed Viking well services swabbing the well, there was workers from EQT hooking up flow lines from the well head to the tanks, there was containment around the well head and no spills to report. | ||||
1375968921 | 2013-08-08 | I am onsite today training with Mike Hartshorn and witnessed that Viking Well Services was swabbing the well. EQT was hooking up flow lines to the tanks. Containment was in place around well and tanks no spills to report. | ||||
1390917513 | 2014-01-28 | The site passed preliminary restoration according to 1509.072A. | ||||
1542845519 | 2013-02-04 | The well is currently shut in. | ||||
2064918232 | 2012-10-10 | Inspection revealed that pad construction is nearly complete.
Note: Filter sock is in place and ditch lines are stoned to help prevent erosion issues. |
||||
-290989011 | 2015-04-06 | On the day of my inspection accompanied by ODNR Inspector Matt Fulk, I witnessed that the production equipment included a sand trap, a GP Unit, a combustor, a sand purge tank, and 4-400bbl tanks and 140bbl within containment. The well was equipped with a pumping unit powered by electricity with valves in the open position. | ||||
-464881941 | 2013-03-11 | On the day of my inspection I witnessed the coil tubing truck rigging up and preparing to drill the frac plugs out. | ||||
-478953518 | 2012-11-13 | Inspection revealed that drilling rig crew was in process of running 20 casing and preparing to cement it in place. | ||||
-525320467 | 2012-09-24 | Site construction underway, entrance way has been made and contractor is working there way back toward drill pad. | ||||
-829311527 | 2013-12-11 | On the day of my inspection, I found the well currently in production, I spoke with a employee of EQT and was told the well is paraffin locked and was in the process of pumping hot water down the back side of the well, there are (4) four hundred barrel production tanks (1) three hundred barrel steel tank and (1) one hundred barrel tank setting inside a steel sealed containment, there is temporary containment established around the well, the I.D. is located at the entry of the lease road. |