If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20764 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.04091888,"lon":-81.10833537,"icon":""}]} |
County: Belmont | |
Municipality: | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-04-08 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.04091888 | |
Longitude: -81.10833537 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 298023.0 | 33.0 | 1144.0 | 33.0 | ||
2014-4 | 890451.0 | 91.0 | 1881.0 | 91.0 | ||
2015-1 | 861181.0 | 90.0 | 188.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1397176436 | 2014-04-10 | On the day of my inspection 20 casing was ran and cemented.. Stingray cementing performed the cement job. See cement ticket for details. No violations noted. | ||||
1408831791 | 2014-04-29 | On the day of my inspection the 13.375 casing was ran and cemented. See cement ticket for details. No violations noted. | ||||
1451216185 | 2014-07-28 | On the date of inspection I accompanied ODNR Inspector Andrew Corder to check the status of the well. The well was currently in stimulation. Refer to Andrew Corder's report for further details. | ||||
-1754360640 | 2014-10-15 | On the day of my inspection completion testing had ceased and the well had all equipment to be capable of production. The tank battery contents included six 400 bbl oil storage tanks and 2 separators. No violations noted. | ||||
1942725560 | 2014-04-26 | Call from operator for spudding the 13.375 section. | ||||
-217006676 | 2014-10-15 | Onsite with Inspector Andrew Corder. Tank battery consisted of 6 400 bbl tanks, all inside containment. Well had a cactus style wellhead and appears capable of production this date. 2 sand seperators and other production equipment onsite. No violations noted. Well was in production during this inspection. | ||||
759089575 | 2014-04-09 | On the day of my inspection ZIEGENFUSS DRILLING was drilling the surface hole for this well. They should be ready for cement tomorrow. No violations noted. |
For data sources see[2]