Well ID: 34-081-20517 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.46625313,"lon":-80.9090798,"icon":""}]} |
County: Jefferson | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-03-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: | |
Violations: 0 | |
Latitude: 40.46625313 | |
Longitude: -80.9090798 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 0.0 | 0.0 | ||||
2013-3 | 0.0 | 0.0 | ||||
2013-6 | 0.0 | 0.0 | ||||
2013-9 | 0.0 | 0.0 | ||||
2014-1 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-4 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-2 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-3 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2015-1 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1425405624 | 2015-03-02 | On the date of inspection I am on site to verify that the well can be placed into Temporary Inactive Status. The well head was equipped with a Christmas tree. The well was shut in and had chains around the Christmas tree so that it could not be tampered with. Production equipment included a horizontal separator, community vapor recovery unit, and six 400bbl community tanks. Three tanks were labeled | ||||
-1573025065 | 2014-03-05 | During my inspection I found the wellhead to be equipped with a Christmas tree valve assembly with all required pressure gauges and valves. The wellhead is in good condition, and is protected from vehicles by concrete barriers. The location has a graveled lease road with a gate, and the pad is fenced and graveled. The pad contains vertical separators and other production equipment. Six 400 bbl production tanks are situated within a coated steel SPCC containment. The erosion controls are in place and functioning, and vegetation is well established. Preliminary restoration is passed. | ||||
-356276238 | 2012-10-24 | My inspection found that the lease road was well maintained with a locked gate. The well pad was fenced and contained two wells with assembled christmas tree wellheads onsite. The wells were surrounded by steel fencing and cement barriers. The well pad also consisted of a six 400 barrel tank battery with steel dike in place and separators and production equipment. A crew was on site testing the electronics and wiring of the production systems during the inspection. There are no violations at this time. |