If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24512 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.90216659,"lon":-81.33104965,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-07-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 39.90216659 | |
Longitude: -81.33104965 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1412732028 | 2014-10-07 | I am onsite to witness the surface casing cementing operations. The drilling rig, Patterson 316, drilled 374' of 24 hole. The rig crew then ran 374' of 18.625 casing. Allied Oil and Gas Services cemented the casing in place with 734 sacks of class A cement. | ||||
-2005952953 | 2014-11-17 | My inspection today finds the drilling rig, Patterson 316, is drilling 8.75 hole at a depth of 11,193'. Meyers Well Service is onsite to haul off rain water from the drainage sumps. | ||||
-426803163 | 2014-07-13 | The said well was spudded on 07/12/2014 by Express Energy's top hole rig with 100' of 32 diameter conductor borehole being drilled with freshwater being picked up while drilling at 32'. Express Energy cement services cement the .375 wall x 26 x 86' conductor pipe on 07/13/14 using 100 sacks of class A 2% calcium .50 pps flake using 100% calculated open hole excess of cement and 55.74 barrels of fresh water displacement and 25 barrels of good cement returns to surface. |
For data sources see[1]