If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24351 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99175879,"lon":-81.25999331,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: R E GAS DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-04-19 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.99175879 | |
Longitude: -81.25999331 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2015-1 | 263615.0 | 85.0 | 12512.0 | 85.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1406391352 | 2014-07-26 | On the day of my inspection I witnessed that Sidewinder Drilling Rig #63 drilled a 17.5 inch diameter hole to the depth of 1300 feet and set 1300 feet of 13.375 inch J-55 54.5#/ft. casing. Halliburton was on site and gained circulation with 150bbls of fresh water then pumped 50bbls of gel, 5bbls of fresh water and cemented casing with 1140 sacks of Class A cement with a 15.6ppg density and a yield of 1.21. Displaced cement with 194bbls of fresh water. Good returns of 60bbls of cement, plug was landed at 625psi and pressured up to 1150psi for 5 minutes and the floats held. Cement stayed to surface. | ||||
1826259450 | 2015-02-25 | On the day of my inspection I witnessed that flow back has been completed and the well is online and equipped with a production tree with valves in the open position. Production equipment included a sand trap, a GP Unit, an oil stabilizer unit, a vapor recovery system and a total of 15-400bbl tanks all within containment. The site passed preliminary restoration according to ORC 1509.072A. |
For data sources see[2]