If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27190 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38245136,"lon":-81.88432649,"icon":""}]} |
County: Coshocton | |
Municipality: | |
Operator Name: ANADARKO E & P ONSHORE LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-06-06 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.38245136 | |
Longitude: -81.88432649 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 0.0 | 641.0 | ||||
2013-12 | 0.0 | 0.0 | ||||
2013-3 | 0.0 | 308.0 | ||||
2013-6 | 0.0 | 0.0 | ||||
2013-9 | 0.0 | 0.0 | ||||
2014-3 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-4 | 0.0 | 92.0 | 0.0 | 92.0 | ||
2015-1 | 4649.0 | 90.0 | 942.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1141347113 | 2013-04-26 | On the day of my inspection I found that the well head was shut in with multiple valves and equipped with remote monitoring devices. There were no lines connected and there were no storage tanks present. All drilling, completion and testing equipment has been removed from the location. The location was fenced and locked, there were no leaks or spills and proper identification was posted at the well pad. | Compliance Notice | |||
-1184276866 | 2012-10-18 | Well is being fraced by Trican services. They are currently on stage 9. Met consultant named Jerry Trout. The Horizontal loggers will pump the casing gun down to the next stage. | ||||
1342714442 | 2012-07-19 | On day of inspection Key rig 886 is at a depth of 6300' around the trempleau formation. 115 units of gas is the highest gas count from the mud loggers to date. | ||||
1343151574 | 2012-07-23 | Key rig | ||||
1357757085 | 2013-01-09 | On the day of my inspection I found that Express Well Services was on location monitoring the flow back. There was no report of natural gas shows and the flares were not ignited. All of the flow back equipment was on containment liners and dikes. There were no leaks or spills. | ||||
1404321221 | 2014-07-02 | On the day of my inspection I found that the well was not in production. The wellhead was shut in and there was no production equipment on or near the location. The annual production reports show 0 MCF of gas and 0 barrels of oil for 2013. Plug the well within 180 days of the issuance of this compliance notice. | ||||
-1424696376 | 2012-05-31 | Zigeenfuss is drilling top hole. They finished mouse hole. Will drill 24into good rock. | ||||
-1495057527 | 2012-11-13 | On the day of my inspection I found that Express Oilfield Services was setting up to flow the well back. The frac plugs were already drilled out, and there were no reports of any oil or gas shows. There were no leaks or spills, all equipment was on containment liners and dikes. No violations at this time. | ||||
-1576837445 | 2012-08-03 | Production string was completed by Key energy rig 886 and Halliburton. Rig 886 ran 20lb/ft of 5.5casing to depth of 10,188. The total depth was at 10,216'in a 7.875open hole. Good circulation was established. Top of cement should be at 3224'. | ||||
2014340348 | 2015-01-23 | I received a call from Scott Kees of NGO to inform me that they were assuming ownership of this well, and they were trying to produce it. On the day of my inspection I found that the well had been equipped with a pumping unit. The unit was pumping at the time of my inspection. The valve was open and the gauge showed 250 psi. The well was pumping into a 300 barrel frac tank. There was also a temporary gas line running to a separator. This well has been made capable of production. This violation is resolved. | ||||
-2074061527 | 2012-10-18 | On the day of my inspection I found that Trican was on the 9th stage of well completion. All equipment was on containment liner and there were no leaks or spills. There were no significant pressure changes during inspection. No violations at this time. | ||||
-2118515733 | 2012-07-11 | On day of inspection Key rig 886 ran 8 .625casing and Universal cemented string in place. Good circulation. | ||||
391420600 | 2012-06-06 | 24casing was set to depth of 136'.Wait on large drill rig. | ||||
524611641 | 2013-11-12 | On the day of my inspection I found that nothing has been done to put this well in production and nothing has been done to reclaim the site. The well head was shut in and there was no production equipment. |
For data sources see[2]