34-169-25574

Well Details

Well ID: 34-169-25574
Loading map...
County: Wayne
Municipality:
Operator Name: MORTON SALT INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-11-17
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 40.9553993
Longitude: -81.78091453

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1086726613 2014-03-06 ID is in place and legible. No apparent problems at time of inspection.
1264510885 2009-11-16 Pit construction today while UDI moves their drilling rig in .
1293561229 2010-06-16 Check on Priliminary restoration and found that it is not ready, too much of the location needs grading and vegetation.
1363805185 2009-11-17 Finish 2 nd pit construction .UDI will start drilling today after the pits are filled and they mix mud.
-1391300024 2014-10-24 A water-brine interface mechanical integrity test was performed on the well. Also present were Kenny Brown, Ed Willse, and Mark Kurtz. Calculations indicated a net pressure change of less than 0.05 psi./hour, between the well and the reference. The well passed the test.
1416248780 2014-10-24
1472117653 2009-11-24 M.I.T. After 15 minute test. Start at 500 psi and end with 500 psi. test passed.
-1535023725 2009-11-19 Rig did not get started drilling until late and now surface hole will not be finished until late tonight.
-1696831136 2009-12-08 Check on drilling pits and found that they have not been closed .Pit level and liners are good and in place.
1751215996 2014-05-28 Appears to have no problems at time of inspection. Proper signage in place and legible.
-1766670389 2009-11-25 Rig is down for repairs today and will move on Monday to drill next well for Morton Salt.
-1771285790 2010-03-09 Pits are closed and area is rough.Needs graded and seeded.
-1850545015 2012-03-26 My inspection of this well site found the well in operation and the proper identification is posted. The Preliminary Restoration is complete.
-2018573300 2009-11-18 Rig is broke down and may be late tonight before drilling starts.
465387842 2014-10-24 ID is in place . No apparent problems at time of inspection. (MIT test being conducted by Insp. Ochs at time of inspection.)
510766287 2009-11-23 UDI ran 2757 ft of 8 5/8 casing c/w 800 sks and had 30 bbl of cement returns.
72729487 2010-04-06 Primary restoration has not been completed.
-776752647 2009-11-19 UDI called and said they would be ready at 7 to 7 :30 to set surface.They got hung on the trip out and had to circulate each joint of casing back to bottom. They had problem with the Halliburton head and after 2.5 hours gave up on head and just did cement job without plug with a swedge.
785870430 2009-11-30 Pit level and liner are good - Rig is moving today
-808796742 2009-12-22 Pit level and liners are good .

For data sources see[1]