If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24435 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91360351,"lon":-81.31458179,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-08-27 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.91360351 | |
Longitude: -81.31458179 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-3 | 498848.0 | 92.0 | 12667.0 | 92.0 | ||
2014-2 | 635809.0 | 88.0 | 23070.0 | 88.0 | ||
2014-4 | 251440.0 | 92.0 | 3719.0 | 92.0 | ||
2015-1 | 191883.0 | 90.0 | 726.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1377711771 | 2013-08-27 | My inspection today finds that Express drilling ran 100' of 26 conductor. Allied circulated 336 sks of class A cement into place. The cement stayed in place. | ||||
-1398757265 | 2015-02-11 | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. | ||||
431266025 | 2014-04-30 | My inspection finds the diesel spill that took place during the completion phase is still causing some sheen on top of the water in the sump. The company is hauling all water off site to be disposed of or recycled. I have asked the company to remove all contaminated stone and soil. The tank battery is comprised of eight 400 bbl tanks set in a containment system. | ||||
441013848 | 2013-12-10 | My inspection today finds Patterson rig 342 is drilling 8.5 hole at a depth of 13430'. | ||||
547267121 | 2014-05-16 | The well is equipped to be capable of production. The well is produced into eight 400 bbl tanks set in liquid tight containment. The GPS data was updated to enhance accuracy. |
For data sources see[2]