34-067-21343

Well Details

Well ID: 34-067-21343
Loading map...
County: Harrison
Municipality:
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-06-04
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.31442651
Longitude: -81.08669302

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2015-1 21920.0 30.0 4021.0 30.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1402439266 2014-06-10 Upon arrival to the location Alphia-Hunter rig #9 was running 9 5/8 inch diameter casing to the depth of 1598 feet. Halliburton Energy will be cementing to surface. At the northwest side of the location a slip has started to develop. It covers an area of 68 feet wide and 32 feet long. It has slipped about 30 inches. The Company personal has been made aware of it and an engineer and the proper personal will be on location 6/11/2014 to address the problem.
1403093573 2014-06-15 Upon arrival on location I found Alphia Hunter Rig # 9 installing 9 5/8 inch diameter intermediate casing with Halliburton Energy cementing casing to surface. Circulation was established and circulated 15 bbl of good cement returns to surface.
1412092699 2014-09-30 On the date of inspection I was informed by company man Brandon Bramlage that the Nomac 245 rig had drilled an 8.75 inch diameter hole to a total depth of 17, 408 feet. At the time of inspection Wyoming Casing Crew was setting the 5.5 inch production casing and cementing would occur late tonight or early the next morning. After cementing the rig was being released.
-1913203986 2015-03-23 At the request of Steve Opritza, I inspected the Mills to determine if the wells are in production. In talking to a company repsentive of Eclipse the wells are still in the flow back mode and will be turned into the pipeline system to start production in two days.

For data sources see[2]