If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 37-003-22205 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.513358,"lon":-79.715013,"icon":""}]} |
| Operator Name: PENNECO OIL CO INC | |
| First Permit Date: 2012-01-11 | |
| Last Permit Date: 2012-01-11 | |
| Spud Date: 2012-06-14 | |
| Unconventional: No | |
| Horizontal: No | |
| Violations: None | |
| Latitude: 40.513358 | |
| Longitude: -79.715013 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2013-0 | 10833.0 | 365.0 | 0.0 | 0.0 | 97.8 | 365.0 |
| 2012-0 | 3449.0 | 92.0 | 0.0 | 0.0 | 72.3 | 92.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|---|---|---|---|---|---|---|---|
| 2012-0 | FRACING FLUID WASTE | 1310.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2012-0 | PRODUCED FLUID | 1189.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2012-0 | DRILLING FLUID WASTE | 570.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
| 2012-0 | FRACING FLUID WASTE | 1310.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2012-0 | PRODUCED FLUID | 1189.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
| 2012-0 | DRILLING FLUID WASTE | 570.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
| 2013-0 | PRODUCED FLUID | 637.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 2052685 | 2012-02-29 | No Violations Noted | TOP HOLE COMPLETE. TOP HOLE RIG IS GONE.
THE SITE IS CLEAN AND DOZED. |
|
| 2054239 | 2012-02-22 | No Violations Noted | US ENERGY DRILLING TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
SITE IS OK. |
|
| 2054293 | 2012-03-06 | No Violations Noted | US ENERGY DRILLED TOP HOLE FOR THIS HORIZONTAL OIL AND GAS WELL.
THE SITE IS BEING REPAIRED FOR THE BIG RIG. |
|
| 2054300 | 2012-02-16 | No Violations Noted | US ENERGY RIG DRILLED INTO OPEN MINE AT 6OO'.
BASKET ABOVE THE MINE WILL BE SET AT 560'. |
|
| 2055030 | 2012-03-21 | No Violations Noted | TOP HOLE COMPLETE. BIG RIG WILL FINISH. | |
| 2064318 | 2012-04-19 | No Violations Noted | TOP HOLE COMPLETE. SITE IS CLEAN AND DOZED FOR BOTTOM HOLE RIG.
THE PIT LEVEL IS LOW. |
|
| 2067389 | 2012-04-27 | No Violations Noted | TOP HOLE IS COMPLETE. NO BOTTOM HOLE RI YET. | |
| 2072476 | 2012-05-21 | No Violations Noted | TOP HOLE IS COMPLETE. NO BIG RIG YET. THERE IS NO ACTIVITY AT THIS SITE. | |
| 2074687 | 2012-06-08 | No Violations Noted | CONTRACTOR EXPANDING SITE AND SPREADING STONE. BIG RIG WILL ARRIVE IN THE NEXT FEW DAYS.
SITE AND E&S ARE OK. |
|
| 2078182 | 2012-06-14 | No Violations Noted | LES WILSON RIG #25 WILL DRILL THE BOTTOM PORTION OF THIS SHALLOW, HORIZONTAL OIL WELL.
THE RIG IS UP AND SUPPORT EQUIPTMENT IS BEING SET. THE SITE IS IN GOOD SHAPE. |
|
| 2081745 | 2012-07-03 | No Violations Noted | John Ley WQS SWRO was on site to conduct a site inspection. The site sign was properly displayed and the E&S plan was on site. The Erosion and Sediment Pollution Control Program Manual, pg. 30 states "Rock filters are not required where roadway surface is stabilized, ditches are provided with protective liners, and cut banks are stabilized."
The attached pictures show that none of the banks along the access road have been stabilized. At a minimum, the banks should be stabilized (i.e. seeded and mulched) to help prevent erosion of the ditches themselves and excess sedimentation. In addition to the road banks needing stabilized by seeding and mulching, the entire site (banks and fill) needs to be stabilized. The picture showing the staining on the pit sidewalls, shows that at one time there was less than the required 2 feet of freeboard, as required by the regulations. The photo shows there is now the 2' of freeboard, but this 2' of freeboard should always be maintained, at all times. |
|
| 2085953 | 2012-07-05 | No Violations Noted | DRILLING COMPLTE AND THE RIG IS GONE. TD @ 5008'. | |
| 2085954 | 2012-07-09 | No Violations Noted | DRILLING EQUIPTMENT IS GONE. THE SITE IS CLEAN. WATER IS BEING TRUCKED IN FOR THE FRAC JOB. | |
| 2093434 | 2012-08-02 | No Violations Noted | THIS HORIZONTAL OIL WELL HAS BEEN DRILLED AND FRACED.
SERVICE RIG IS RUNNING TUBING. |
|
| 2106815 | 2012-10-09 | No Violations Noted | DRILLING COMPLETE. WELL IS FRACED. A SERVICE RIG IS UP AND WORKING. SITE IN GOOD CONDITION. | |
| 2116548 | 2012-10-22 | No Violations Noted | JACK IS OPERATING. THE SITE IS IN GOOD SHAPE. TANKS ARE DIKED. | |
| 2167324 | 2013-05-13 | Allegheny | Plum Boro | No Violations Noted |