If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0475123407000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.095264,"lon":-115.666669,"icon":""}]} |
Location: 00/07-34-047-12W5/0 | |
Location Alias: 00/07-34-47-12 W5M | |
Location Alias 2: 00/07-34-047-12 W5/00 | |
Province: Alberta | |
County/Municipality: Yellowhead County | |
Well Name: TIDEWATER BRAZR 7-34-47-12 | |
Operator Name: | |
License Number: 0064655 | |
License Date: 1977-07-07 | |
License Status: Abandoned | |
Spud Date: 1977-07-25 | |
Final Drill Date: 1977-10-19 | |
Well Total Depth: 3185.2 m | |
Surface Hole Latitude: 53.095264 | |
Surface Hole Longitude: -115.666669 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-11-07 | Perforation | 3113.8 | 3126 | 7 |
1978-03-14 | Acid Wash | 3113.8 | 3126 | 0 |
1997-01-09 | Packing Device Capped w/Cement | 2860 | 2994 | 0 |
1997-01-15 | Packing Device Capped w/Cement | 2839 | 2847 | 14 |
1997-01-16 | Packing Device Capped w/Cement | 1697 | 1705 | 0 |
1997-01-16 | Perforation | 1495 | 1496 | 14 |
1997-01-17 | Remedial Casing Cementing | 1495 | 1496 | 13 |
1997-01-17 | Cement Plug | 716 | 1496 | 0 |
1997-01-19 | Perforation | 670 | 671 | 13 |
1997-01-21 | Packing Device Capped w/Cement | 652 | 660 | 0 |
1997-01-21 | Perforation | 500 | 501 | 13 |
1997-01-22 | Remedial Casing Cementing | 500 | 501 | 0 |
1997-01-22 | Cement Plug | 3.5 | 501 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 126 | 1277.0 | 0.0 | 0.0 |
1984 | 1631 | 16766.1 | 0.0 | 149.5 |
1985 | 5826 | 65248.2 | 0.0 | 503.3 |
1986 | 4204 | 49824.7 | 0.0 | 214.4 |
1987 | 5942 | 65756.2 | 0.0 | 375.7 |
1988 | 7890 | 70460.2 | 0.0 | 346.8 |
1989 | 7879 | 84990.0 | 0.0 | 410.3 |
1990 | 1655 | 18516.6 | 0.0 | 96.5 |
1991 | 0 | 97765.1 | 0.0 | 0.0 |
1992 | 0 | 85569.8 | 0.0 | 0.0 |
1993 | 0 | 77815.4 | 0.0 | 0.0 |
1994 | 0 | 72582.4 | 0.0 | 0.0 |
1995 | 0 | 32324.5 | 0.0 | 0.0 |
1996 | 0 | 41399.7 | 0.0 | 0.0 |
For data sources see[4]