If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0104081716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":49.826885,"lon":-111.048544,"icon":""}]} |
Location: 00/16-17-010-08W4/0 | |
Location Alias: 00/16-17-10-08 W4M | |
Location Alias 2: 00/16-17-010-08 W4/00 | |
Province: Alberta | |
County/Municipality: County of Forty Mile No. 8 | |
Well Name: SALTA ENERCO MEDHAT 16-17-10-8 | |
Operator Name: | |
License Number: 0082676 | |
License Date: 1980-05-08 | |
License Status: RecCertified | |
Spud Date: 1980-05-13 | |
Final Drill Date: 1980-05-18 | |
Well Total Depth: 957 m | |
Surface Hole Latitude: 49.826885 | |
Surface Hole Longitude: -111.048544 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-05-24 | Perforation | 939.5 | 940.5 | 6 |
1980-05-24 | Acid Treatment | 939.5 | 940.5 | 0 |
1980-05-24 | Packing Device Capped w/Cement | 932 | 932 | 0 |
1980-05-25 | Perforation | 704 | 705.5 | 6 |
1980-05-25 | Perforation | 683.5 | 686 | 6 |
1980-05-25 | Perforation | 688.5 | 690 | 6 |
1980-07-24 | Packing Device Capped w/Cement | 700 | 700 | 0 |
1980-07-24 | Packing Device Capped w/Cement | 678 | 678 | 0 |
1980-07-24 | Selective Jet Perforation | 571.2 | 571.9 | 0 |
1980-07-24 | Selective Jet Perforation | 573.8 | 574.8 | 0 |
1980-07-24 | Selective Jet Perforation | 575.8 | 578.2 | 0 |
1980-07-24 | Selective Jet Perforation | 579.2 | 586 | 0 |
1980-07-24 | Selective Jet Perforation | 587 | 587 | 0 |
1980-07-25 | Fracture | 571.2 | 587 | 0 |
1980-10-16 | Perforation | 364 | 367.8 | 3 |
1980-11-05 | Fracture | 364 | 367.8 | 0 |
1997-12-21 | Packing Device Capped w/Cement | 349.1 | 357.1 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 5044 | 149.9 | 0.0 | 3.5 |
1982 | 6790 | 148.3 | 0.0 | 1.8 |
1983 | 8316 | 156.8 | 0.0 | 1.5 |
1984 | 8524 | 139.3 | 0.0 | 0.2 |
1985 | 8591 | 148.2 | 0.0 | 0.9 |
1986 | 7927 | 111.8 | 0.0 | 3.8 |
1987 | 8665 | 107.0 | 0.0 | 6.7 |
1988 | 8609 | 119.1 | 0.0 | 4.1 |
1989 | 8599 | 94.5 | 0.0 | 5.3 |
1990 | 8144 | 92.9 | 0.0 | 8.3 |
1991 | 7491 | 107.8 | 0.0 | 3.5 |
1992 | 8115 | 147.7 | 0.0 | 0.0 |
1993 | 5842 | 80.9 | 0.0 | 0.0 |
1994 | 8340 | 97.1 | 0.0 | 0.0 |
1995 | 741 | 7.7 | 0.0 | 0.0 |
For data sources see[4]