If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485101913000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.14564,"lon":-115.460977,"icon":""}]} |
Location: 00/13-19-048-10W5/0 | |
Location Alias: 00/13-19-48-10 W5M | |
Location Alias 2: 00/13-19-048-10 W5/00 | |
Province: Alberta | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK PEMBINA 13-19-48-10 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0434709 | |
License Date: 2011-06-29 | |
License Status: Issued | |
Spud Date: 2011-08-14 | |
Final Drill Date: 2011-08-26 | |
Well Total Depth: 3612 m | |
Surface Hole Latitude: 53.14564 | |
Surface Hole Longitude: -115.460977 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-18 | 1454 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-28 | Open Hole/Barefoot Completion | 3607 | 3612 | 0 |
2011-10-24 | Multi-Stage Fracture | 3581 | 3581.1 | 0 |
2011-10-24 | Multi-Stage Fracture | 3496.9 | 3497 | 0 |
2011-10-24 | Multi-Stage Fracture | 3421.9 | 3422 | 0 |
2011-10-24 | Multi-Stage Fracture | 3332 | 3332.1 | 0 |
2011-10-24 | Multi-Stage Fracture | 3254.7 | 3254.8 | 0 |
2011-10-24 | Multi-Stage Fracture | 3180.9 | 3181 | 0 |
2011-10-24 | Multi-Stage Fracture | 3089.6 | 3089.7 | 0 |
2011-10-24 | Multi-Stage Fracture | 3014.1 | 3014.2 | 0 |
2011-10-24 | Multi-Stage Fracture | 2923.1 | 2923.2 | 0 |
2011-10-24 | Multi-Stage Fracture | 2845.9 | 2846 | 0 |
2011-10-25 | Multi-Stage Fracture | 2768.6 | 2768.7 | 0 |
2011-10-25 | Multi-Stage Fracture | 2691.7 | 2691.8 | 0 |
2011-10-25 | Multi-Stage Fracture | 2601.9 | 2602 | 0 |
2011-10-25 | Multi-Stage Fracture | 2524.7 | 2524.8 | 0 |
2011-10-25 | Multi-Stage Fracture | 2447.5 | 2447.6 | 0 |
2011-10-25 | Multi-Stage Fracture | 2355.7 | 2355.8 | 0 |
2011-10-25 | Multi-Stage Fracture | 2280.5 | 2280.6 | 0 |
2011-10-25 | Multi-Stage Fracture | 2217.5 | 2217.6 | 0 |
2011-10-25 | Multi-Stage Fracture | 2140.7 | 2140.8 | 0 |
2011-10-25 | Multi-Stage Fracture | 2078.3 | 2078.4 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 48 | 9.1 | 0.0 | 0.0 |
2012 | 7751 | 1288.8 | 0.0 | 0.0 |
2013 | 8691 | 1385.8 | 0.0 | 0.0 |
2014 | 8388 | 1098.6 | 0.0 | 0.0 |
2015 | 8396 | 1000.9 | 0.0 | 0.0 |
2016 | 8468 | 878.1 | 0.0 | 0.0 |
2017 | 8550 | 713.1 | 0.0 | 112.9 |
2018 | 7368 | 525.0 | 0.0 | 79.3 |
2019 | 196 | 17.8 | 0.0 | 2.6 |
For data sources see[5]