If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36646 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.490138,"lon":-79.323782,"icon":""}]} |
Operator Name: CNX GAS CO LLC | |
First Permit Date: 2009-09-08 | |
Last Permit Date: 2009-09-08 | |
Spud Date: 2010-03-12 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.490138 | |
Longitude: -79.323782 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 7446.93 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 8531.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 12923.99 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 17447.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 67.73 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) - CNX GAS CO | BARNESVILLE | OH |
2010-0 | FRACING FLUID WASTE | 100.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2010-0 | FRACING FLUID WASTE | 200.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | PRODUCED FLUID | 160.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | DRILLING FLUID WASTE | 5160.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2010-0 | FRACING FLUID WASTE | 1200.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | PRODUCED FLUID | 39.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 67.73 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) - CNX GAS CO | BARNESVILLE | OH |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1870205 | 2010-03-10 | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Pit dug with no 20 mil plastic and no freeboard issues. Spud called on 3-12-10. Well sign and E&S plan located at the entrance way of site. Down gradient wood filter fence and sock along site pad. | |
1870943 | 2010-03-18 | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Pit aligned with 20 mil plastic and no freeboard issues. Falcon set conductor pipe (13 3/8¿) 42 `. 7¿ pipe set at 1308¿ used 270 sks Class A with 0 bbl return. 8 hr set up time recorded on log. Falcon was at 3660¿. Water detected at 210¿, 240¿, 500¿ and 520¿. Spud called on 3/12/10. Well permit present along with well log. Stratigraphy consisted of sandstone, limestone, shale and coal. Well sign and E&S plan located at the entrance way of site. Down gradient filter fence present along site pad. | |
1872019 | 2010-03-16 | No Violations Noted | Drilling was appeared to have been complelted at the time of the inspection. Below grade pit located onsite and te liquid fraction had been removed from the pit, it had been relined and was in the process of being filled for well stimulation. Observed no accelerated erosion and sedimentation on the access road or well-site. | |
1954019 | 2011-03-02 | No Violations Noted | At the time of inspection, well tag present. Well in production. Well completed on 03/18/10. Site adequately and uniformly restored, hence operator may remove all temporary bmp¿s previously installed. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Access road adequately rocked. Brine tank appears sound. Well site gated. |