X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0344092715020

Well Details

Well ID: 0344092715020
Loading map...
Location: 02/15-27-034-09W4/0
Location Alias: 02/15-27-34-09 W4M
Location Alias 2: 02/15-27-034-09 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: TAC 12-26 HZ 102 PROVOST 15-27-34-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0492613
License Date: 2018-12-06
License Status: Issued
Spud Date: 2019-01-03
Final Drill Date: 2019-01-21
Well Total Depth: 2018 m
Surface Hole Latitude: 51.948903
Surface Hole Longitude: -111.184791

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
03 Jan 2019 Predator Drilling Inc. 8 N/A Drill To LD
19 Jan 2019 Tempco Drilling Company Inc. 8 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-01-19 230
2019-01-20 1086 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-12 Perforation 1998 1998.5 20
2019-02-12 Perforation 1965 1965.5 20
2019-02-12 Perforation 1930 1930.5 20
2019-02-12 Perforation 1904 1904.5 20
2019-02-12 Perforation 1871 1871.5 20
2019-02-12 Perforation 1845 1845.5 20
2019-02-12 Perforation 1813 1813.5 20
2019-02-12 Perforation 1777 1777.5 20
2019-02-12 Perforation 1742 1742.5 20
2019-02-12 Perforation 1695 1695.5 20
2019-02-12 Perforation 1649 1649.5 20
2019-02-12 Perforation 1602 1602.5 20
2019-02-12 Perforation 1564 1564.5 20
2019-02-12 Perforation 1517 1517.5 20
2019-02-12 Perforation 1473 1473.5 20
2019-02-12 Perforation 1446 1446.5 20
2019-02-12 Perforation 1399 1399.5 20
2019-02-12 Perforation 1365 1365.5 20
2019-02-12 Perforation 1330 1330.5 20
2019-02-12 Perforation 1295 1295.5 20
2019-02-12 Perforation 1260 1260.5 20
2019-02-12 Perforation 1212 1212.5 20
2019-02-12 Perforation 1177 1177.5 20
2019-02-12 Perforation 1143 1143.5 20
2019-02-25 Fracture 1930 1930.5 0
2019-02-25 Fracture 1904 1904.5 0
2019-02-25 Fracture 1871 1871.5 0
2019-02-25 Fracture 1845 1845.5 0
2019-02-25 Fracture 1813 1813.5 0
2019-02-25 Fracture 1777 1777.5 0
2019-02-25 Fracture 1742 1742.5 0
2019-02-25 Fracture 1695 1695.5 0
2019-02-26 Fracture 1649 1649.5 0
2019-02-26 Fracture 1602 1602.5 0
2019-02-26 Fracture 1564 1564.5 0
2019-02-26 Fracture 1517 1517.5 0
2019-02-26 Fracture 1473 1473.5 0
2019-02-26 Fracture 1446 1446.5 0
2019-02-26 Fracture 1399 1399.5 0
2019-02-26 Fracture 1365 1365.5 0
2019-02-26 Fracture 1330 1330.5 0
2019-02-26 Fracture 1295 1295.5 0
2019-02-26 Fracture 1260 1260.5 0
2019-02-26 Fracture 1212 1212.5 0
2019-02-26 Fracture 1177 1177.5 0
2019-02-26 Fracture 1143 1143.5 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 528 44.0 0.0 105.0

For data sources see[6]

References