If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0524262502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.514316,"lon":-113.697165,"icon":""}]} |
Location: 00/02-25-052-26W4/0 | |
Location Alias: 00/02-25-52-26 W4M | |
Location Alias 2: 00/02-25-052-26 W4/00 | |
Province: Alberta | |
County/Municipality: Edmonton | |
Well Name: CEDAR CREEK ACHE 2-25-52-26 | |
Operator Name: | |
License Number: 0076713 | |
License Date: 1979-07-03 | |
License Status: RecCertified | |
Spud Date: 1979-07-08 | |
Final Drill Date: 1979-07-16 | |
Well Total Depth: 1303 m | |
Surface Hole Latitude: 53.514316 | |
Surface Hole Longitude: -113.697165 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-07-27 | Perforation | 1235.5 | 1238.5 | 20 |
1979-07-28 | Perforation | 1235.5 | 1238.5 | 2 |
1987-03-04 | Fracture | 1235.5 | 1238.5 | 0 |
2006-08-17 | Packing Device Capped w/Cement | 1217.9 | 1225.9 | 0 |
2006-08-21 | Perforation | 540 | 541 | 13 |
2006-08-21 | Remedial Casing Cementing | 540 | 541 | 0 |
2006-08-23 | Perforation | 316 | 317 | 13 |
2006-08-24 | Remedial Casing Cementing | 316 | 317 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 1437 | 550.2 | 0.0 | 0.0 |
1980 | 4626 | 1128.8 | 0.0 | 0.0 |
1983 | 3240 | 413.5 | 0.0 | 0.0 |
1984 | 5232 | 608.2 | 0.0 | 0.0 |
1985 | 8323 | 641.6 | 0.0 | 0.0 |
1986 | 336 | 27.5 | 0.0 | 0.0 |
1987 | 7379 | 2280.8 | 0.0 | 193.5 |
1988 | 8685 | 1787.9 | 0.0 | 218.6 |
1989 | 8699 | 1534.2 | 0.0 | 335.7 |
1990 | 8759 | 813.7 | 0.0 | 233.8 |
1991 | 8743 | 850.4 | 0.0 | 190.1 |
1992 | 8599 | 724.1 | 0.0 | 257.7 |
1993 | 8747 | 743.9 | 0.0 | 225.5 |
1994 | 8753 | 739.9 | 0.0 | 383.8 |
1995 | 8759 | 609.0 | 0.0 | 416.6 |
1996 | 8781 | 368.7 | 0.0 | 687.3 |
1997 | 8669 | 286.4 | 0.0 | 940.0 |
1998 | 7415 | 143.9 | 0.0 | 843.4 |
1999 | 5500 | 104.9 | 0.0 | 501.2 |
2000 | 4019 | 140.1 | 0.0 | 55.5 |
2001 | 8719 | 112.6 | 0.0 | 34.7 |
2002 | 3012 | 37.4 | 0.0 | 4.3 |
For data sources see[4]