If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374163502022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.218932,"lon":-112.179212,"icon":""}]} |
Location: 02/02-35-037-16W4/2 | |
Location Alias: 02/02-35-37-16 W4M | |
Location Alias 2: 02/02-35-037-16 W4/02 | |
Province: Alberta | |
County/Municipality: County of Paintearth No. 18 | |
Well Name: GEAR PROVOST 2-35-37-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0254868 | |
License Date: 2001-05-10 | |
License Status: Suspension | |
Spud Date: 2001-06-01 | |
Final Drill Date: 2001-06-04 | |
Well Total Depth: 1164.5 m | |
Surface Hole Latitude: 52.218932 | |
Surface Hole Longitude: -112.179212 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-06-19 | Perforation | 1136 | 1137.1 | 17 |
2001-06-30 | Perforation | 1000 | 1002.5 | 17 |
2001-06-30 | Perforation | 1004.5 | 1009 | 17 |
2001-07-08 | Fracture | 1000 | 1009 | 0 |
2002-07-31 | Packing Device Capped w/Cement | 1126 | 1134 | 0 |
2002-08-02 | Fracture | 1000 | 1009 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 3335 | 785.6 | 0.0 | 483.2 |
2003 | 8557 | 1457.7 | 0.0 | 1354.5 |
2004 | 8358 | 1194.5 | 0.0 | 1197.0 |
2005 | 6569 | 953.5 | 0.0 | 1101.2 |
2006 | 7709 | 944.3 | 0.0 | 1177.0 |
2007 | 8409 | 742.6 | 0.0 | 1088.8 |
2008 | 4778 | 378.0 | 0.0 | 605.3 |
2009 | 7489 | 676.7 | 0.0 | 946.5 |
2010 | 8588 | 570.8 | 0.0 | 784.5 |
2011 | 3917 | 290.5 | 0.0 | 513.9 |
2012 | 2371 | 156.7 | 0.0 | 290.4 |
For data sources see[4]