37-005-30684

Well Details

Well ID: 37-005-30684
Loading map...
Operator Name: HIGHPOINTE OIL & GAS LLC
First Permit Date: 2010-07-27
Last Permit Date: 2010-07-27
Spud Date: 2010-10-30
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.994694
Longitude: -79.329086

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 7218.0 365.0 0.0 0.0 0.0 0.0
2012-0 8365.0 365.0 0.0 0.0 0.0 0.0
2011-0 8428.0 300.0 0.0 0.0 0.0 0.0
2010-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 50.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2011-0 PRODUCED FLUID 160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2012-0 PRODUCED FLUID 50.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2013-0 PRODUCED FLUID 80.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346 PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT PUNXSUTAWNEY PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1923822 2010-10-29 No Violations Noted Site construction underway, drilling had commenced at the time of the inspection. Erosion controls for the site and access road had been implemented as outlined in the E&S plan.
1927444 2010-11-15 No Violations Noted Drilling and well stimulation had been completed at the time of the inspection. Well was flowing back into the below grade pit located onsite. Pit had more than the required two feet of lined freeboard. All access road and site erosion controls had been implemented properly and no evidence of accelerated erosion or sedimentation was observed.
1950634 2011-02-17 No Violations Noted Drilling had been completed. Well was equipped for production, brine tank located onsite and appeared to be in sound condition. Drill pit still located onsite and it had the required two feet of lined freeboard, however once the fluid melts the operator should remove fluids from the pit for disposal. Operator should close the drill pit, begin final site grading along with final site and access road stabilization as soon as the weather permits. All access road and site erosion controls had been implemented properly and no evidence of accelerated erosion or sedimentation was observed.
2066760 2012-05-10 No Violations Noted Drilling was completed 11/05/10, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Noted that a majority of what was the well pad had been tilled as part of a cultivated crop field. The remainder of the well-site had been properly restored and the vegetative cover met the 70% uniform coverage criteria.

References