X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555212613000

Well Details

Well ID: 0555212613000
Loading map...
Location: 00/13-26-055-21W5/0
Location Alias: 00/13-26-55-21 W5M
Location Alias 2: 00/13-26-055-21 W5/00
Province: Alberta
County/Municipality: Yellowhead County
Well Name: PEYTO NOSEHILL 13-26-55-21
Operator Name: Peyto Exploration & Development Corp.
License Number: 0481707
License Date: 2016-12-02
License Status: Issued
Spud Date: 2017-01-04
Final Drill Date: 2017-01-16
Well Total Depth: 4171 m
Surface Hole Latitude: 53.789078
Surface Hole Longitude: -117.001792

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
04 Jan 2017 Trinidad Drilling Ltd. 434 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-05 302
2017-01-13 2912 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-17 Open Hole/Barefoot Completion 4092 4171 0
2017-02-02 Multi-Stage Fracture 4070.6 4070.7 0
2017-02-02 Multi-Stage Fracture 4004 4004.1 0
2017-02-02 Multi-Stage Fracture 3901.2 3901.3 0
2017-02-02 Multi-Stage Fracture 3810.2 3810.3 0
2017-02-02 Multi-Stage Fracture 3718 3718.1 0
2017-02-02 Multi-Stage Fracture 3628.5 3628.6 0
2017-02-02 Multi-Stage Fracture 3549.5 3549.6 0
2017-02-02 Multi-Stage Fracture 3460.1 3460.2 0
2017-02-02 Multi-Stage Fracture 3357 3357.1 0
2017-02-02 Multi-Stage Fracture 3241.8 3241.9 0
2017-02-02 Multi-Stage Fracture 3163.8 3163.9 0
2017-02-02 Multi-Stage Fracture 3111.2 3111.3 0
2017-02-02 Multi-Stage Fracture 3033.7 3033.8 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
02/02/2017 02/02/2017 non-hazardous ingredients Not Available Bactericide/Biocide 0.01 Trican
water Not Available 79.9895
silica crystalline 14808-60-7 16.8453 Trican
2.2-dibromo-3-nitrilopropionamide 10222-01-2 Bactericide/Biocide 0.01 Trican
2-mercaptoethanol 60-24-2 Bactericide/Biocide 0.01 Trican
dibromoacetonitrile 3252-43-5 Bactericide/Biocide 0.01 Trican
non-hazardous ingredients Not Available Bactericide/Biocide 0.01 Trican
sodium bromide 7647-15-6 Bactericide/Biocide 0.01 Trican
choline chloride 67-48-1 Clay Control 0.1486 Trican
non-hazardous ingredients Not Available Clay Control 0.1486 Trican
anionic polyacrylamide Not Available Friction Reducer 0.0197 Trican
non-hazardous ingredients Not Available Scale Inhibitor 0.0183 Trican
propylene glycol 57-55-6 Scale Inhibitor 0.0183 Trican
ethylene/propylene oxide polymer Not Available Surfactant 0.0797 Trican
methanol 67-56-1 Surfactant 0.0797 Trican
water Not Available Surfactant 0.0797 Trican

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
1/7/2017 0 2/3/2017 0:00 Groundwater - Non-saline less than or equal to 150m deep 4984

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 7923 25125.2 0.0 2629.2
2018 8729 11503.1 0.0 527.1
2019 2159 2155.6 0.0 110.8

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-18 No Incident N/A N/A
2017-02-06 No Incident N/A N/A

For data sources see[9]

References