If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0475032607000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.067986,"lon":-114.319575,"icon":""}]} |
| Location: 00/07-26-047-03W5/0 | |
| Location Alias: 00/07-26-47-03 W5M | |
| Location Alias 2: 00/07-26-047-03 W5/00 | |
| Province: Alberta | |
| County/Municipality: Leduc County | |
| Well Name: DAYLIGHT HZ PEMBINA 7-26-47-3 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0435083 | |
| License Date: 2011-07-12 | |
| License Status: Amended | |
| Spud Date: 2011-07-29 | |
| Final Drill Date: 2011-08-12 | |
| Well Total Depth: 2611 m | |
| Surface Hole Latitude: 53.067986 | |
| Surface Hole Longitude: -114.319575 |
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-03 | 740 | Horizontal |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-08-24 | Open Hole/Barefoot Completion | 1754 | 2611 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1728.1 | 1728.2 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1635.2 | 1635.3 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1542.7 | 1542.8 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1452.8 | 1452.9 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1365.4 | 1365.5 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1273.8 | 1273.9 | 0 |
| 2011-08-24 | Multi-Stage Fracture | 1180.5 | 1180.6 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 2813 | 35.6 | 0.0 | 1721.5 |
| 2012 | 8629 | 107.1 | 0.0 | 3868.4 |
| 2013 | 8507 | 167.4 | 0.0 | 2383.9 |
| 2014 | 8531 | 70.9 | 0.0 | 1990.0 |
| 2015 | 8756 | 43.3 | 0.0 | 1613.3 |
| 2016 | 8783 | 29.0 | 0.0 | 2070.6 |
| 2017 | 3527 | 4.7 | 0.0 | 324.0 |
| 2019 | 1054 | 0.6 | 0.0 | 638.2 |
For data sources see[5]