X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0785210305000

Well Details

Well ID: 0785210305000
Loading map...
Location: 00/05-03-078-21W5/0
Location Alias: 00/05-03-78-21 W5M
Location Alias 2: 00/05-03-078-21 W5/00
Province: Alberta
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ NVILLE 5-3-78-21
Operator Name: Long Run Exploration Ltd.
License Number: 0437591
License Date: 2011-10-11
License Status: Issued
Spud Date: 2012-01-26
Final Drill Date: 2012-02-02
Well Total Depth: 2237 m
Surface Hole Latitude: 55.722343
Surface Hole Longitude: -117.159902

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
26 Jan 2012 Ensign Drilling Inc. 88 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-28 599
2012-01-30 1103 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-03 Open Hole/Barefoot Completion 2208.7 2237 0
2012-02-06 Multi-Stage Fracture 2208.6 2208.7 0
2012-02-06 Multi-Stage Fracture 2156.7 2156.8 0
2012-02-06 Multi-Stage Fracture 2104.8 2104.9 0
2012-02-06 Multi-Stage Fracture 2052.9 2053 0
2012-02-06 Multi-Stage Fracture 2001 2001.1 0
2012-02-06 Multi-Stage Fracture 1949.1 1949.2 0
2012-02-06 Multi-Stage Fracture 1897.4 1897.5 0
2012-02-06 Multi-Stage Fracture 1845.9 1846 0
2012-02-06 Multi-Stage Fracture 1794.1 1794.2 0
2012-02-06 Multi-Stage Fracture 1742.2 1742.3 0
2012-02-06 Multi-Stage Fracture 1690.6 1690.7 0
2012-02-06 Multi-Stage Fracture 1638.6 1638.7 0
2012-02-06 Multi-Stage Fracture 1586.9 1587 0
2012-02-07 Multi-Stage Fracture 1535.1 1535.2 0
2012-02-07 Multi-Stage Fracture 1471.4 1471.5 0
2012-02-07 Multi-Stage Fracture 1407.7 1407.8 0
2012-02-07 Multi-Stage Fracture 1342.2 1342.3 0
2012-02-07 Multi-Stage Fracture 1278.5 1278.6 0
2012-02-07 Multi-Stage Fracture 1215.1 1215.2 0
2012-02-07 Multi-Stage Fracture 1151.4 1151.5 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7352 1936.0 0.0 8102.5
2013 7474 514.4 0.0 4934.0
2014 8230 597.4 0.0 6171.5
2015 8403 1255.6 0.0 10316.4
2016 8702 1374.9 0.0 10830.4
2017 8415 1240.7 0.0 10166.1
2018 8671 1336.4 0.0 10512.7
2019 2139 210.4 0.0 2590.6

For data sources see[6]

References